|
Identification And Delimitation Of The Georeferenced Nucleus Perimeter, With Issuance, Establishment Of The Reurb Following The Criteria Of Law 13.465/2017 And Decree, Public Hearing With The Community, Core Perimeter Plant Containing The Possible Owners And Searches In The Real Estate Registry Office To Identify Owners And, 03/04/2025, Notification Of Confrontants And Owners Under The Terms Of The Law 13.465/2017 And, Prevention And Administrative Resolution Of Conflicts To Remedy Any Opposition, Georeferenced Planialtimetric Survey Of The Area., Preliminary Study Of The Discomfort And Legal Situation, Urban And Amb, Socioeconomic Register, Urban Project According To Article 36 Of Federal Law 13.465/2018 And Article 31 Of, Description Memorial And Rrt Signed By Legal Professional, Proposal Of Solutions For Environmental, Urbanistic And Resettlement Issues, Environmental Technical Study, For The Purposes Provided For In Federal Law 13.465/2017, Physical Schedule Of Services And Implementation Of Essential Infrastructure Works, A Commitment To Be Signed By The Public Or Private, Simplified Social And Simplified Socioeconomic Registration, Simplified Urban Project, Descriptive Memorial Simplified, Sanitation Of The Process, Approval Of The Prf By The Competent Authority, According To Law No. 13.465/2017., Expedition Of The Crf, Application To The Crf Registration Office And Regularization Project, Following The Registration Protocol And Correction Of Possible Returnatives Of The, Junior Level, Including Complementary Charges, Social Assistant, Engineer, Engineer/Architect, Special Consultant, Even Complementare, Consultant Level, Supervisor Engineer, Travel Daily With Or Without Overnight, Including Food, Administrative Assistant, Designer, 53 Kw Light Vehicle, Intercity Displacement, Step I - Mobilization And Information Of Families, With Preliminary Services, Step Ii - Services For The Preparation Of Technical Studies Necessary For The Elaboration, Step Iii - Land Regularization Project, In Accordance With Arts. 35 And 36 Of, Step Iv -Registration Of The Land Regularization Project And Opening Of The Planialtimetric And Registration Survey -Terrens Up To 2,000 M², Budget Spreadsheet For New Constructions, Budget Spreadsheet For Infrastructure Works, Project Compatibility, Rain Drainage Project, Mobilization And Demobilization Of Percussion Percussion Equipment, Percussion Probation With Test Standard Penetration (Spt), Diameter, Executive Project Of Concrete Structure, Project Of Drinking Water Supply System, Project Of Sewage Collection And Treatment System, Electric Network Extension Project, Paving Project, Urban Signaling Project, Structural Reinforced Concrete Containment, Landscape Project, Public School Type (Architectural, Structural, Public Equipment Project (Architectural, Type Public Equipment Project Leisure (Architectural, Hydraulic, Public Equipment Project (Architectural Type
|