Construction Work - Construction And Equipment Of Elementary School In Babin Vir Settlement. The Subject Of Procurement Is The Construction And Equipping Of Elementary School In Babin Vir In Požega, All In Accordance With The Main Project. The Building In Question Is Public And Social Purposes And Is Designed With Three Above Ground Floors. The Procedure Includes Kč. 4585, K.O. Pozega With A Total Area Of 20,872 M2. The Building Is A Detached Of A Maximum Dimension Of 94.95 M X 47.99 M. The Elementary School Is Scheduled For 560 Students And 50 Employees. On The Ground Floor There Are Covered Entrances, Windshields, Multi -Purpose, Toilets And Locker Rooms, Multipurpose Two -Piece Hall, Small Sports Hall, Staircase And Elevator Space, Communication Premises, Storage Rooms, Cabin, Classrooms For Class Teaching, Dining Room, Kitchen Drive, Economic Storage, Repair Storage Janitor, Space With Wardrobe And Toilets. On The First Floor There Is An Outdoor Teaching Area, A Classroom Of Subject Teaching, Communication, Staircase And Elevator, Cabinets Of Subject Teaching/Smaller Working Groups, Sanitary Facilities, Administration Department And Specialized Classroom Classrooms. On The Second Floor There Are Premises Of The Subject Teaching, Communications, Sanitary Facilities, Staircases And Elevator, School Library And Reading Room, Specialized Classrooms For Teaching, Cabinet/Smaller Working Groups, Sensory Room, Classroom For Children With Special Needs. With The Southern Outlet On The Ground Floor, The Building Is Directly Connected To External Sports Fields. Papers Include: Hall 1. Building Crafts 2. Water Supply, Sewerage And Hydrant Network 3. Mechanical Engineering 4. Electrical Engineering 5. Fire Schools 1. Construction - Crafts Papers 2. Water Supply, Sewerage And Hydrant Network 3. Mechanical Engineering. Crafts 2. Water Supply, Sewerage And Hydrant Network 3. Electrical Engineering Installations Are Performed By This Case In Accordance With The Cost -Ups That Forms An Article 1. The Contracting Authority Has The Following Project Documentation: Main Project • Folder 1 Architectural Project • Mapa 2 Construction Project Construction • Mapa 3 Construction Project Water Supply, Sewer And Hydrant Network • Mapa 4 Main Pormetic And Surface Drainage Projects • Folder 5 Construction Project Rational Use Of Energy And Thermal Protection Of The Building • Mapa 6 Electrical Engineering Project • Map 9 Fire Project Project Creating This Main Project Was Preceded By The Development Of The Following Study • Study Of Occupational Safety Of Occupational Safety • Geotechnical Report Due To The Size Of The Map 2 Of The Construction Project Construction Is Available On The Client Website, At The Link: Https://Www.Pozega.Hr/Javna-Nabava/Nmv-8-25- Construction-Or-Oral-Sne-Up-Ski-Naselju-Babin-Vir-U-Pose For A Building Was Obtained By A Building.
|