3 The Task Is To Be Completed In Accordance With: 1) By Decision No. 17/2025 Of The Poviat Eldership In Strzelce Opolskie Approving The Construction Project And Granting The Building Permit, 2) The Technical Specification Of The Execution And Receipt Of Works, And The Attached Regiments Are Only An Auxiliary Document, 3) A Land Use Project, 4) Architectural And Construction Project. 3 The Task In Question Is Expected: 1) The Expansion Of The Primary School With A Sports Room And Auxiliary Rooms A. Execution Of The Shell Of The Building (Foundations, Construction, Roof Structure, Roofing, Partitions, Ground, Floor, Floors, Floors, Thermal Insulation, Plasters, Carpentry) B. Execution Of The Facade; C. Execution Of Electrical, Sanitary Installations, Heating, Ventilation, Air Conditioning And Lightning Protection; D. Delivery Of The Stage With A Protective Liner; 2) Data Characteristic Of The Expanded Part: A. The Area Of New Buildings - 617.4 M2 B. Utility Area Of The Ground Floor 534.2 M2 Including Mens Sanitary Facility - 15.00 M2 With A Sanitary Facility Nie. - 5.00 M2 C. Pietra Usable Area 236.6 M2 Including: Hall Pietra - 25.0 M2 With A Computer Room - 71.5 M2 With Secretariat - 27.6 M2 For Womens Sanitary - 14.5 M2 For Mens Sanitary - 15.00 M2 With Sanitary Facilities. Nie. - 5.00 M2 D. The Height Of The Single -Storey (Room) Part 11.98 M, And The Two -Storey Part 12.30 M.3) Reconstruction Of The Existing Primary School Building 4) Modular Pitch Measuring 12.5X21.25M; 5) Two Descents For A Plot From The Public Road Góra St. Anna Marked In The Local Of Sticks Kdg (25), Then Through The Internal Paved And Hardened Road. Painted And Access Is 1414.50M2; 6) Hardened Parking Spaces For Passenger Cars 10, Including 1 Item For Disabled People, The Area Is 130.50M2; 7) Land Development, Restoration Of Low Greenery Consisting In Leveling The Area, Spreading The Fertile Soil And Performing The Lawn; 8) Execution Of The Seat Waste - Rubbish And Removal On The Principles In Force In The Commune - The Shelter Area 15M2; 9) Connecting, Measuring And Fire Power Switch On The Building; 10) Collecting Debris And Waste Resulting From The Implementation Of The Subject Of The Contract And Transferring Them To Recovery, Disposal Or Storage. 4. The Performance Of The Task Also Includes: 1) Ensuring Supervision Over The Works Carried Out By The Construction Manager With Appropriate Permissions, Along With All Obligations Arising From The Construction Law; 2) Conducting Attempts And Acceptance With The Participation Of The Required State Institutions, Investor And User; 3) Preparing A Safety And Health Protection Plan, If Separate Provisions Require Such A Plan; 4) Comprehensive Geodetic Service And Inventory Geodetic As -Built. 5) Organization, Development And Liquidation Of The Construction Site. 6) Organization And Marking Of Construction. Scrap Trunks, Carp Roots, Etc. It Should Be Taken Without Undue Delay To A Waste Landfill Or Transferred To An Entrepren
|