Reconstruction Of The Forest Road - Fire Access No. 6. The Subject Of The Contract Is The Reconstruction Of The Existing Forest Road Running Through Journal Of Laws No. 516, 515, 514 Dąb Dąb Wielkie Włocławek Commune And Journal Of Laws No. 579 Dobiegniewo Dobiegniewo Włocławek Commune. The Scope Of The Construction Intention Includes The Reconstruction Of The Surface Of The Forest Road (Fire Access) Along With The Reconstruction Of The Adjacent Intersections And The Roadsides, And Profiling Fragments Of The Adjacent Area - The Slopes As Well As Reproducing Existing Roadside Ditches. The Scope Of The Study Applies To A Segment With A Length Of 0.999 Km, I.E. From Km 0+737.00 To Km 1+736.00. The Planned Reconstruction Is Within The Existing Road Lane Borders. The Scope Of Earthworks Includes: A) Execution Of Excavations And Embankments Along With The Export Of Excess Spoil Outside The Construction Site; B) Execution Of The Troughs For Surfaces Together With The Export Of Excess Spoil Outside The Construction Site; C) Making The Cutting Of Adjacent Unpaved Areas In Order To Enable Rainwater Flow; D) Restoration Spoil And Export Of Excess Spoil Outside The Construction Site; E) Making Profiling And Compaction Of The Substrate Under The Structural Layers Of The Surface. Production Of Vegetation - Before Starting The Works, The Necessary Cutting Of Trees And Self -Seeding With A Diverse Age Class Should Be Made In The Designed Development Area (Within The Edge Of The Road) And Remove Carp Together With The Entire Root System. The Above Range Includes Cutting Out And Removing Existing Root Systems Within The Edge Of The Road Along The Length Of The Designed Reconstruction. The Material From The Tree Felling, Carp And Roots Should Be Derived Outside The Construction Site In Place Indicated By The Investor. The Road Surface Of The Road Includes: A) The Surface Made Of Mechanically Stabilized Aggregate (Senit, Gabro, Granite) 0/31.5 Gr. 10 Cmb) Foundation Made Of Mechanically Stabilized (Recycled Concrete Aggregate) C) 0/63 Gr. 15 Cmd) Sand Shut -Off Layer Gr. 10 Cme) Profiled Thickened Ground Ground Is> L, 00 -Construction Pavement Pavement Includes: A) The Surface Made Of Mechanically Stabilized Aggregate (Senitit, Gabro, Granite) 0/31.5 Gr. 10 Cmb) Foundation Made Of Mechanically Stabilized (Recycled Concrete Aggregate) 0/63 Gr. 15 Cmc) Sand Cutting Layer Gr. 10 Cmd) Profiled Thickened Ground Ground Is> L, 00 -Construction Roadside Surfaces Include: A) The Surface Of Mechanically Stabilized Broken Aggregate (Sienit, Gabro, Granite) 0/31.5 Gr. 15 Cmb) A Cutting Layer From Sand 10 Cmc) Profiled Thickened Soil Ground Is> L, 00 New: Recycled Concrete Aggregate Must Meet The Requirements Of The Pn-En 13242+Al: 2010 Standard-Aggregates To Unrelated And Hydraulically Connected Materials Used In Building Facilities And Road Construction And Be In Line With The Technical Requirements Of Wt-4 Regarding The Crops Of Unrelated Crops Cement. Setting Area) Road Area
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94181944
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.