|
Task 1 A) Construction Of A Sanitary Sewage System With Connections And A Sewage Pumping Station In Ul. Fellings In The Town Of Maszewo Duże On Plot No. 236, 231/4, 231/6, 231/7, 229/2, 239/1, 238, 245, 240/1, 369/1, 369/2: • Gravity Sanitary Sewage System Pp Dn200 – Approx. 1040.60 M, • Pp Dn160 Sanitary Sewage Connections – Approx. 88 M, • Pe Dn90 Pressure Sanitary Sewage Network – Approx. 328.4 M, • Sewage Pumping Station Dn 1500 – 1 Pc. B) Construction Of A Water Supply Network And Sanitary Sewage System On The Plot . No. 239/1, 239/5, 239/7 In Ul. Wiązowa In The Town Of Maszewo Duże:• Pe Dn90 Water Supply Network - Approx. 177.50 M,• Pp Dn200 Gravity Sanitary Sewage Network - Approx. 135.90 M, C) Construction Of A Sanitary Sewage System On Plot No. 231/4 , 229/16, 229/2, 231/5, 229/17, 229/18 In Ul. Wierzbowa In The Town Of Maszewo Duże:• Gravity Sanitary Sewage Network Pp Dn200 - Approx. 204.30 M,D) Construction Of A Water Supply Network On Plot No. 257/11, 229/2 In The Town Of Maszewo Duże:• Pe Water Supply Network Dn160 - Approx. 152.40 Meters, Additionally, The Offer Should Include: A) Delivery And Installation Of Galvanized Steel Pillar Cranes Located At Each Sewage Pumping Station (Crane Capacity Adjusted To The Weight Of Individual Pumps), B) Installation Of Gate Valves At The Pumping Stations At The Inlet Of Sewage Flowing Inside The Pumping Station, C) Updating Of The Existing Sewage Pumping Station Monitoring Software, D) Monitoring ( Tv Inspection) Of A Newly Built Network With Connections - Tv Inspection And Diagnostics Of Sanitary Sewage Using A Specialized Camera Along With Measurement Of Slopes, - Providing The Ordering Party With A Complete Set Of Documentation In Printed And Electronic Versions Along With Recording Videos And/Or Images From The Camera Recording. E) Connecting The Internal Electrical Installation From The Meter To The Electrical Installation Of The Sewage Pumping Station Along With Submitting A Statement Of Readiness Of The Installation Electricity Certified By An Authorized Electrician, F) Reports On The Performance Of Hydrants, G) Tightness Tests, H) Water Tests, I) Hardening Of The Area Around The Sewage Pumping Station (Crushed Stone, Geotextile),
|