Supply Of Smps Based Ipssmps Based Ips,Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply (Ips) Sys Tem As Per Rdso Spec. No.Rdso/Spn/165/2023 (Ver.4.0) Amendment 1.0 Along With Surge Protection Device, Status Monitoring Panel, Spares,Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells (Cells As Per Rdso Spec. Irs :S-88/2004 ) Along With Battery Stand.The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017 / 0002-10 For Ibs With Lc Gate . This Include Transportation To Consignee Depot To Site ,Installation And Commissioni Ng Of Integrated Power Supply System After Duly Filling Pre Commissioning Checklist Jointly By Rdso Approved V Endor And Railway Representative. [ Warranty Period: 48 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply (Ips) Sy Stem As Per Rdso Spec. No. Rdso/Spn/165/2023 (Ver.4.0) Amendment 1.0 Along With Surge Protection Device, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Sells (Cells As Per Rdso Spec. Ir S:S-88/2004) Along With Battery Stand . The Configuration Of Ips Should Be Per Ncr/Hq Drawing No. Typ/2017/0 002-11 For Relay Hut /Lsc With Aftc, Axle Counter And Lc Gate.This Includes Transportation To Consignee Depot, From Consignee Depot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filling P Re Commissioning Check List Jointly By Rdso Approved Vendor And Railway Representative. [ Warranty Period: 4 8 Months After The Date Of Delivery ] ] , Supply And Commissioning Of Smps Based Integrated Power Supply Syste M For Interlocked Lc Gate In Re Section As Per Rdso Specn.No. Rdso/Spn/165/2023 (Ver.4. 0) Amendment 1.0 As Per Drawing Attached (Nc.Rly. Drg. No. Typ/2017/0002-09) Of Along With Battery Set Of 110V/300Ah. This Include Transportation To Consignee Depot To Site ,Installation And Commiss Ioning Of Integrated Power Supply System After Duly Filling Pre Commissioning Checklist Jointly By Rdso Approve D Vendor And Railway Representative. [ Warranty Period: 48 Months After The Date Of Delivery ] ] , Supply Installation Testing And Commissioning Of Smps Based Integrated Power Supply (Ips) Syst Em, As Per Rdso Spec. No. Rdso/Spn/165/2023 (Ver.4.0) Amendment 1.0 Along With Surge Protection Device, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells ( Cells As Per Rdso Spec. Ir S:S-88/2004 ) Along With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/ Hq Drawing No. Typ/20 17/0002-06 For Ei Station Up To 04 Lines With Block Panel And Lc Gate. This Includes Transportation To Consignee D Epot From Consignee Depot To Site , Installation And Commissioning Of Integrated Power Supply System After Duly Fi Ling Pre Commissioning Check List Jointly By Rdso Approved Vendor And Railway Representative. [ Warranty Peri Od: 48 Months After The Date Of Delivery ] ] , Supply, Installation Testing And Commissioning Of Smps Based Integrated Power Supply System (I Ps ), As Per Rdso Spec. No. Rdso/Spn/165/2023 (Ver.4.0) Amendment 1.0 Along With Surge Protection Device , Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells ( Cell As Per Rdso Spec. Ir S-S-88/2004) Along With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/201 7/0002-08 For Ei Station Up To 6 Lines With Block Panel And Lc Gate. This Include Transportation To Consignee Depot To Site ,Installation And Commissioning Of Integrated Power Supply System After Duly Filling Pre Commissioning Ch Ecklist Jointly By Rdso Approved Vendor And Railway Representative. [ Warranty Period: 48 Months After The Da Te Of Delivery ] ]
|