Construction Work – Semmelweis University Anatomy Building Development. Renovation, Expansion And Modernization Of The Anatomy Building Of The Anatomy, Histology And Development Institute Of The Semmelweis University (Budapest, 9Th District, Tűzoltó Utca 58, Hrsz: 37192), Energy Efficiency-Increasing Development Within The Framework Of The Rrf - European Union Recovery And Resilience Facility Program. Budapest Capital Ix. Ferencváros Municipality Representative Board 35/2017. (Xii.22.) No. On The Protection Of The Settlement Image, The Building Is A District Protected Building Complex. The Works Must Be Carried Out On Schedule, Ensuring The Proper Functioning Of The Building. In Both Wings Of The Building, The 2Nd Floor Extension With New Internal Reinforced Concrete Load-Bearing Structures And Steel Load-Bearing Structures And The Attic Level As The 3Rd Floor Are To Be Built. In The Wings Of The Building, New Training And Dissection Rooms Will Be Built On 3 Levels Together With The Related Rooms, And The Dissection Rooms On The 3Rd Floor Will Be Rebuilt And Renovated. The Height Of The 2 Existing Elevators, 1 Existing Elevator Will Be Demolished. Two New Reinforced Concrete Elevator Shafts Will Be Installed In The Central Wing Of The Building And The Related Rooms Will Be Rebuilt, As Well As The Water Blocks And Related Rooms Will Be Rebuilt And Renovated, And The Attic Level Will Be Rebuilt. During The Works, The Roof Of The Building Will Also Be Renewed Together With The Related Structures. The Facade Surfaces Of The Buildings Masonry Brick Will Also Be Renewed. A New Fire Alarm Network And Fire Protection Renovation Are Also Being Prepared For The Entire Building. Building Mechanical Renovation And Reconstruction Is Also Being Prepared, Within Which A Significant Volume Of Modern Ventilation Systems Will Be Created. The Works Affect The Entire Floor Area. The Building On The West Side Of The Building Will Be Demolished, And A New Service Building (Basement And Ground Floor) Will Be Built In Its Place. A Soil Probe System Will Be Installed In The Yard To Supply The Modern Building Mechanical Heating And Cooling System. Due To The Drilling Of Soil Probes And The Demolition And Construction Work Of The Service Building, The Complete Arrangement Of The Area Becomes Necessary, So The Internal Garden And Road Network Will Be Renewed As Part Of The Project. The Total Net Floor Area Of The Building Affected By The Works Is 7,958 M2. In The Course Of The Buildings Renovation And Conversion, Storey Addition, Attic Installation And Environmental Management Works Covering All Disciplines (Demolition, Supporting Structure, Architecture, Building Electrical Engineering, Building Mechanics, Building Automation, Public Utility Construction, Special Civil Engineering, Road And Square Paving Construction, Garden Construction) Significant Work Parts: - 777 M3 Of New Load-Bearing Monolithic Reinforced Concrete Structure To Be Made Inside The Building, - Installation Of 45,181 Tons Of New Load-Bearing Steel Structure, - Renovation Of Exposed Brick Facade Surface With Historic Brick Cleaning Process 3750 M2, - Energetic Modernization Of Building Mechanical System: Design Of New Heating - Cooling System ( With The Construction Of A Vrv/Vrf System), Where The Heat Pump Performance Data: Heating Performance
|