Ventilation And Air-Conditioning Installation Work – Ms Gars_Ventilation Work. Project Description - 1St Ba Measures Ventilation Installations Start Of Execution Week 38/2024 - Start Of Dismantling Work Week 40/2024 - Raw Installation Wc Core East Week 18/2025 - Commissioning, Acceptance • Ventilation Ducts Scope: Approx. 495 M2 • Spiral Folded Pipes Ø80-400Mm Scope: Approx. 580 Linear Meter • New Ventilation Device (System 1) Distribution Kitchen + Cafeteria With Heat Recovery And Approved Exhaust Fan For The Commercial Kitchen • New Ventilation Device (System 2) As A Ceiling Device (Basic Ventilation) For Toilet Rooms + Adjoining Rooms (Some Internal Rooms) In The Basement • Supplementary Ventilation Room Sound Furnace Has No Heat Recovery Via A Supply And Exhaust Air Fan (System 3). Ventilation Only Takes Place While The Clay Oven Is In Operation • Additional Ventilation Room Safety Lighting Via An Explosion-Proof Exhaust Fan (Appendix 4). Afterflow Via Overflow Flap From Neighboring Room • New Ventilation Device (System 5) As A Ceiling Device (Basic Ventilation) For The School Kitchen. The Cooking Areas In The School Kitchen Have Ceiling-Mounted Circulating Air Hoods. Scope: 5 Island Hoods • The New Teachers Toilet Rooms Will Have A Pure Exhaust System Above The Roof. Afterflow Via Door Undercut Scope: 3 Exhaust Fans (Toilet Fans) • Renovated Toilet Core (Conversion In 2007), Due To The Necessary Fire Compartments, The Existing Ventilation Cannot Continue To Be Operated. A Supply Air System Is Being Retrofitted. • Dismantling Of Existing Equipment (Supply And Exhaust Fans) Including Ventilation Ducts Of The School Kitchen In The Basement. Scope: Approx. 50M2 • Relocation Of The Existing School Ventilation Devices Due To Room Shifts Scope: 20 Pieces Of Existing Ventilation Devices Systemair Svu-B • Reconnection Of Exhaust And Outside Air From All Existing Devices To The New Facade Scope: 20 Pieces Of Facade Closures + 220M Spiral Folded Pipe With Condensation Water Insulation • Addition Of School Ventilation Devices For An Additional Classroom Scope 1 Ventilation Device • Creation Of Core Drillings And Fire Protection Upgrade Of Existing Pipes. • Scope: Core Drilling Through Reinforced Concrete Walls And Ceilings Core Drilling Sizes Ø40-200Mm Approx. 34 Running Meters • Dismantling And Disposal Of Server Room Cooling Scope: 1 Piece. Outdoor Unit, 1 Piece. Indoor Unit • Construction Of A Multi-Split System For Year-Round Cooling Room Server Room And Ela + It Room Scope 1X Outdoor Unit + 2X Indoor Units
Contact Information
Address
Giesinger Bahnhofplatz 2
Contact No.
+49 89124147135
Email
bob@bayerngrund.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 81428038
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.