Construction Work – Se Tömő U. 25-29. S. Intact. Energy Effect. Development. Semmelweis University Tömő Utca 25-29 S. Construction Works For The Energy Efficiency Development Of The Building (Pulmonology Clinic) The Purpose Of The Investment Is Energy Saving And Safe Operation. The Investment Is Aimed At Renovation And Modernization Aimed At Increasing Energy Efficiency. Total Usable Floor Area Of The Building: 10,465 M2 Tasks To Be Performed: General Items Clearing, Earth And Rock Work On-Site Concrete And Reinforced Concrete Work Placement And Installation Of Prefabricated Building Structural Elements Masonry And Other Masonry Work Installation Of Metal And Light Building Structures Dry Construction Preparation Of Cold And Hot Coverings, Substrate Preparation Tinning Placement Of Wooden And Plastic Structures Placement Of Metal Doors And Windows And Building Lock Structures Surface Preparation Insulation Separate Surface Machine Base Heating-Cooling Ventilation Water Tap Electrical Work Types Automation, Building Supervision (As Part Of This: Distribution Cabinet Assembly, Software Programming.) Placement Of Aluminum Interior Doors And Windows / 57 Pcs Hsz04 – Heat Pump Heating Power: 352 Kw, Cooling Power: 481.5 Kw / 1 Pc Hcs1 – Heat Exchanger Power: 465 Kw / 1 Pc Hcs2 – Heat Exchanger Power: 350 Kw / 1 Pc Hcs3 – Heat Exchanger Power: 350 Kw / 1 Pc Hcs4-Hcs5 – Heat Exchanger Output: 350 Kw / 2 Pcs Hcs6-Hcs7 - Heat Exchanger Output: 135 Kw / 2 Pcs Ahu02 - Slab Building Air Handling / 1 Pc Supply Air Volume: 28000 M3/H Extract Air Volume: 29000 M3/H Supply External Static Pressure: 600 Pa Extract External Static Pressure: 600 Pa Heat Recovery Type: Intermediate Medium - Ahu03 - Tower Building Air Handling / 1 Pc Supply Air Volume: 29000 M3/H Extracted Air Volume: 29000 M3/H External Static Pressure Of Supply: 600 Pa External Static Pressure Of Exhaust: 600 Pa Heat Recovery Type: Intermediate Medium – Ahu4 - Non-Invasive Air Handling Unit / 1 Pc Insulated Air Volume: 6000 M3/H Exhausted Air Volume: 6000 M3/H External Static Pressure Of Supply: 500 Pa External Static Pressure Of Exhaust: 500 Pa Type Of Heat Recovery: Mediating Medium – Ahu5 - Oncology Air Treatment / 1 Pc Air Volume Supplied: 7000 M3/H Air Volume Extracted: 7000 M3/H External Static Pressure Of Supply: 800 Pa External Static Pressure Of Extraction: 800 Pa Heat Recovery Type: Intermediate Medium - The Tasks To Be Performed Are Included In Detail In The Budget, Plans And Technical Description Together. The Detailed Technical Description/Plans And The Unpriced Budget Are Included In The Technical Documentation. Tenderer 321/2015. (X. 30.) On The Basis Of § 46 Of The Government Decree, It Is Established That If The Standard, Technical Permit, Technical Specifications, Technical Recommendation, Or Thing Of A Specific Make Or Origin, Or A Specific Procedure Specified In The Invitation To Initiate The Procedure And In The Public Procurement Documents, Refers To A Trademark, Patent, Activity, Person, Type Or Specific Origin Or Production Process, So The Designation Was Made Only In Order To Clearly Define The Nature Of The Object,
Contact Information
Contact No.
+36 208259915
Email
murakozi.anna.dorottya@semmelweis.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 80916812
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.