Heating, Ventilation And Air-Conditioning Installation Work – Hls-Arbeiten. Services: 1.) Heating - Setting Up, Operating, Implementing And Dismantling A Building Heating System - Compact District Heating Station 390 Kw With Power Supply Transfer Station, Central Office, 3 Heating Circuits, Control Cabinet - Pressure Maintenance, Degassing, Make-Up - 478 Pieces Of Flat Radiators With Thermostatic Valve And Return Valve - 145 Pieces Of Bathroom Radiators With Center Connection And Thermostatic Valve - 1,600 M Stainless Steel Heating Pipe In The Apartments, Hallways - 5,000 M Stainless Steel Heating Pipe In The Strands Area, Distribution With Thermal Insulation - 138 Pieces Of Branch Valves / Differential Pressure Regulators - Dismantling Work On The Heat Generator System, 430 Pieces Of Core Drilling, Transport And Recycling Demolition Material 2.) Sanitary - Pressure Boosting System And Accessories - 152 Pieces Of Wall-Mounted Toilet Systems With Concealed Cistern, 3 Pieces Of Barrier-Free Toilet Systems - 152 Pieces Of Washbasin Systems, 3 Pieces Of Barrier-Free Washbasin Systems - 151 Pieces Of Floor-Level Shower Systems With Thin-Bed Floor Drain - 153 Pieces Of Sink Mixer, 144 Pieces Of Wall-Mounted Washing Device Connection - 156 Pieces Of Electric Instantaneous Water Heater - 780 M Of Stainless Steel System Pipe, 4,550 M Of Metal Composite Pipe, Thermal Insulation - 1,200 M Of Pp Wastewater Pipe, 1,320 M Of Highly Sound-Insulated Wastewater Pipe - 1 Piece Of Dirty Water Double Pump Lifting System - 1,280 Pieces Of Core Drilling, Closing Of Breakthroughs, Transport And Recycling Demolition Material 3.) Ventilation - 149 Individual Room Fans - 450 M Spiral Folded Pipe, 149 Ceiling Bulkheads, 26 Combination Roof Hoods - Dismantling 12 Roof Fans, 1 Central Ventilation Unit, 5 Air Conditioning Units, Dismantling 200 M² Sheet Metal Duct, 90 M² Of Insulation Material, 168 Pieces Of Core Drilling, Transport And Recycling Of Demolition Material
|