Dyke Construction Work – Hwsb Saaledeich Re. Km 6.3-8.3 - Dike Construction, Earthworks, Civil Engineering And Road Construction, Landscaping, Pipe Relocation. The Planned Dike Renovation Essentially Includes The Following Partial Services: Clearing Stumps, Creating A Construction Road In The Dike Hinterland, Profiling The Top Of The Dike Or Removal Of The Old Dike In Accordance With The Profile And Reconstruction In Accordance With The Profile Over A Length Of Approx. 2000 M, Taking Into Account The Compliant Structure In Accordance With Din 19712 And Hq100 Plus 1 M Freeboard, New Construction Of A Dike Defense Path (Dvw) In Sections As A Dike Crown Path (Dkw) Or A Land-Side Dike Defense Path (Dvw) Which Also Represents The Drainage Body, Sheet Pile Wall Work, Pipeline Construction Work, Landscaping Work. The Following Main Construction Work Is Required: 10,500 M² Of Archaeological Preliminary Investigations, 7,000 M² Of Construction Roads, Construction, Maintenance And Dismantling, 400 M² Of Hedges/Bushes, Clearing Of 126 Rootstocks, 34,000 M² Of Topsoil Removal And Storage, 22,000 M² Of Topsoil Being Covered, 3,700 M³ Of Topsoil Being Recycled, 23,000 M³ Of Old Soil Remove The Material And Store It Temporarily 34,700 T Transport And Disposal Of Excavated Material, Produce And Compact 46,500 M² Of Subgrade, Deliver And Install 24,300 M² Of Drainage Body Material, Deliver And Install 3,500 M³ Of Support Body Material, Deliver And Install 730 M² Of Steel Sheet Piles, Produce 8,100 M² Of Asphalt Surface Layer, Produce 3,000 M² Of Asphalt Base Layer, Carry Out 40,000 M² Of Sowing Of Lawns Including Preparation 870 M Laying Kom Cable Wsv Incl .Preparatory Work 270 M Laying Kom Cable Telekom Including Preparatory Work
|