Steam-Generating Boilers – Supplementing The Boiler Room With A Second Steam Generator. The Subject Of The Public Contract Is The Addition Of A Second Steam Generator To The Boiler Room, The Replacement Of The Supply Tank, The Installation Of A Sludge Expander, The Relocation Of The Equipment For The Preparation Of Dhw And The Installation Of A New Dhw Tank, The Introduction Of All Pipelines Including Preheating From The Solar System, The Necessary Modifications And Connection Of The Flue And Gas Connection, Air Conditioning For Thermal Load Removal And Installation Of A Battery Ups As Generator Protection Against Short-Term Power Outages.