The Subject Of The Order Is The Execution Of The Task Entitled: Reconstruction Of A Paved Road With A Rainwater Drainage System And Street Lighting Along The Street. Reymont In Oleśnica. The Investment Area Covers The Area Of Ul. Reymonta – Plot No. 28, 130/1 And 300 Am-30, Oleśnica District. The Detailed Scope Of Works Is Included In The Design Documentation Attached To The Tender And Is Described Below. Before Starting The Work, The Elevation Of The Designed Road Should Be Checked In Relation To The Immediately Adjacent Plots, Due To Their Existing Development. Any Differences And Discrepancies Should Be Reported To The Supervision Inspector And The Employer In Order To Make Any Corrections Before The Works Are Carried Out. As Part Of The Subject Of The Order, The Contractor Is To Implement, Among Others: A Road Approximately 100 M Long And 5.5 M Wide, Ending With A Maneuvering Area Of Dimensions 11.5 X 13.3 M, With A Surface Made Of Concrete Cubes, Thickness. 8 Cm Gray In Color, Sidewalk With A Reinforced Substructure, With A Surface Made Of Concrete Cubes. 8 Cm, Gray In Color, Exits To Adjacent Private Plots, With A Width Adapted To The Width Of The Entrance Gates (From 4.5 M To 5 M) And Location In Accordance With The Design Documentation And Existing Exits, With A Surface Made Of Concrete Cubes. 8 Cm Graphite Color, 2 Exits With A Width Adapted To Existing Parking Spaces (Approx. 12 M And 5 M), With A Surface Made Of Concrete Cubes. 8 Cm, Graphite Color, Access To The Property 1.5 M Wide, With A Surface Made Of Concrete Cubes. 8Cm Gray Color, Rainwater Drainage System Made Of Pvc Pipes With A Diameter Of Ø500 Mm (Section Approx. 60 M Long) And Ø315 Mm Diameter (Section Approx. 40 M Long), Along With Sewage Wells Ø1200 (4 Pcs.); Sewers With A Diameter Of Ø160 Mm With Inlets Ø500 (4 Pcs.); And A Stainless Steel Flow Regulator, Connected To The Existing Sewage System In The Street. Reymonta, Road Lighting: Installation Of 4 New Anodized Aluminum Or Galvanized Steel Poles, Approx. 6 M High, Protected With Elastomer At The Bottom, With An Led Luminaire With A Power Of Approx. 39 W; New Poles Should Be Connected To The Existing Cable Network Owned By Tauron Tnt, In Accordance With The Design Documentation; All 4 Pieces Of New Led Luminaires Are To Have A Programmed Dimming Schedule During Night Hours, Along With Wiring From The Luminaire To The Pole, Enabling Subsequent Reprogramming Of The Luminaire From The Ground Level, Without The Need To Rent A Lift, Reconstruction Of The Intersection Of The Reach With The Street. Reymont Together With The Restoration Of Damaged Surfaces, Development Of Green Areas: A 20 Cm Layer Of Humus Should Be Made Of A Slowly Growing Variety Of Grass - Park Or Sports, Adjustment Of The Foundation Level Of Existing Land Infrastructure Elements (Wells, Valves, Boxes, Keys, Valve Pins, Hydrants, Poles Lighting, Etc.) For New Development Of The Area, Protection Of All Existing Exposed Cables With Protective Pipes Under Exits And In Places Of Crossings Under The Road, Permanent Removal Of All Shrubs And Small Trees Along With Grubbing Up Tree Trunks In The Area Covered By The Works, Arrangements, Contracts, Etc. Documents With The Owners External Devices Located In The Road, For Which It Will Be Necessary To Interfere With The Location In Connection With The Implementation Of The Works And All Related Costs, Obtaining Consents To Occupy Adjacent Areas - If Necessary To Perform The Works, Design, Agree And Implement Traffic Organization On Time Of Works And Application To Road Managers For The Occupation Of The Right-Of-Way, Design, Agreement And Implementation Of Permanent Traffic Organization With Horizontal And Vertical Signs Throughout The Entire Study Area, Removal And Disposal Of Material From Demolitions Carried Out In The Right-Of-Way, Including, Among Others, Rubbish, Rubble, Excess Soil As Well As Spreading, Leveling And Tidying Up The Area Within The Area Of The Works Being Performed; After The Works, Tidy Up The Area Within The Area Of The Works Being Performed And Any Adjacent Areas Occupied With The Consent Of The Plot Owners. The Guarantee And Warranty For The Completed Task Covers All Elements Of The Work Performed (Including Light Sources, Etc.). The Contractor Is Obliged To Perform Periodic Inspections And Maintenance Of All Road Lighting Elements Throughout The Warranty And Warranty Period. The Bills Of Quantities Attached To The Tender Should Be Treated As Auxiliary Materials. The Offer Should Price All Works Included In The Design Documentation Attached To The Tender And The Works Additionally Described In The Description Of The Subject Of The Order. The Ordering Party Has Made Every Effort To Ensure That The Description Of The Subject Of The Order Complies With The Act. If A Name, Brand, Etc. Is Specified In The Design Documentation, They Should Be Treated As Examples, And The Ordering Party Allows Equivalent Solutions.
|