The Subject Of The Order Is The Replacement Of A Gas Boiler In The Building Of The Węgrów Cultural Center With A Floor-Standing Condensing Gas Boiler Powered By Low-Pressure Natural Gas. The Boiler Room Covers The Demand For Central Heating Of The Building And Technological Heat For Ventilation Units. The Calculated Thermal Power For Central Heating Is 140 Kw And 248 Kw For Technological Purposes. The Gas Boiler Room For The Building Is Located At The 0.0 M Level, In The Boiler Room. This Room Is A Separate Fire Protection Zone And Cable Passages Through The Walls And Ceilings Of The Room Must Be Fire-Retardant. In Order To Cover The Heat Demand For The Building, A Condensing Gas Boiler With A Rated Heat Load In The Range Of 20.6-432.0 Kw Was Designed. The Designed Boiler Is A Floor-Standing Condensing Boiler With A Modular Structure, With Exchangers Made Of Cast Aluminum, Silicon And Magnesium Alloys. Each Boiler Module Has Its Own Fan, Gas Valve And Modulated Burner With Full Pre-Mixing And Low Nox Emission. This Device Is Characterized By High Power And Small Boiler Dimensions. The Modular Structure Of The Boiler Allows For A Very Wide Range Of Boiler Operation With Power From 22 To 900 Kw With The Number Of Burners: From 2 To 7. Electronic Control, Manual Control Of The Boiler. The Boiler Automation Enables Auto-Adaptation Of The System Operation, Optimization Of The System Operation, Quick Heat-Up Function, Optimization Of The Operation Of The Charging Pump. Due To The Replacement Of The Gas Boiler And The Gas Boiler Room Technology, It Is Necessary To Carry Out Preparatory Work Preceding The Installation Of The Boiler Room Technology, Including: Disassembly Of Existing Sanitary Installations, Dismantling Of 2 Boilers Along With The Foundations For The Boilers, Flue Gas Ducts, Expansion Vessels And Circulation Pumps, Supplementing The Missing Terracotta And Tiles, Foundation For The Boiler, Plaster, Painting, Construction Of The Flue Gas Discharge Pipe, Etc. On Behalf Of The Ordering Party, The Contractor Will Obtain All The Required Permits Related To The Launch Of The Boiler Room, E.G. Permits From The Office Of Technical Inspection, The State Fire Service (If Necessary), The State Sanitary Inspection (If Necessary). It Will Also Prepare The Required Energy Certificate. The Contractor Will Prepare As-Built Documentation Of Construction Works In One Copy, Bound, Described And Provided With A Table Of Contents, In A Paper Version And Another In An Electronic Version (In A Format Agreed With The Ordering Party), Which Will Include, Among Others: Documents Regarding The Materials Used, Research And Test Protocols, Statement Of The Construction Manager. In Addition, The Contractor Will Provide A Complete Set Of Design Documentation With Any Changes Approved By The Authors Supervision And The Supervision Inspector. During The Warranty And Guarantee Period, The Contractor Will Be Obliged To Participate In Inspections Of The Facility No More Than Once A Year And Each Time In The Event Of Defects. As Part Of The Implementation Of The Subject Of The Order, The Following Should Also Be Performed: - All Auxiliary And Accompanying Works That Are Necessary For The Proper Performance Of The Works Included In The Cost Estimate, Including Work Resulting From Technical Specifications And Design Documentation, - All Other Works, Works, (Laboratory) Tests, Activities, Obligations And Requirements Arising From This Specification (Contract, Technical Specification, Design Documentation, Bill Of Quantities), Design Organization Of Works. - In Matters Not Regulated In This Specification, The Applicable Technical Conditions For The Execution And Acceptance Of Construction Works, Polish Standards And European Standards, If Any Are In Force In Poland, And The Provisions Of Construction Law. It Is Recommended That The Contractor Familiarize Himself With The Area Indicated In The Tor, On Where The Work Will Be Carried Out And To Obtain Any Information That May Be Necessary To Prepare The Offer. The Contractor Will Bear All Costs Related To The Preparation And Submission Of The Offer. The Contractor Is Obliged To Be Liable For Damages And Consequences Of Accidents Involving Employees And Third Parties Arising In Connection With The Works Carried Out. For This Purpose, It Is Advisable For The Contractor To Insure His Business Against Civil Liability, Secure The Construction Site And Mark The Works In The Road Area In Accordance With The Regulation. Minister Of Infrastructure Of September 23, 2003 On Detailed Conditions For Road Traffic Management And Supervision Over This Order (Consolidated Text: Journal Of Laws No. 2017, Item 784 Of March 24, 2017). Note! The Contractor Is Obliged To: 1. Submitting A Material And Financial Schedule For The Execution Of Works (According To The Template), 2. Offer Cost Estimate Before Signing The Contract. The Detailed Scope Is Determined By: Construction Design, Bill Of Quantities (Auxiliary), Technical Specification For The Execution And Acceptance Of Construction Works. The Task Is Co-Financed By The Masovian Voivodeship Local Government Under The Mazowsze Support Program For Local Integration Centers 2024.
|