Structural Shell Work – New Building Climate Chamber Center At The Mpi For Molecular Plant Physiology In Potsdam - Shell Construction Work. Short Description Of Services; 1 X Batter Board, 1,120 M² Gravel Layer, Approx. 710 M³ Of Filling Work Space Excavation Pit, 1,096 M² Of Pe Film, Approx. 55 M³ Cleanliness Layer, Approx. 258 M³ Of In-Situ Concrete Floor Slabs Including Edge Formwork, Approx In-Situ Concrete Including Formwork, 140 M³ Of Trench Excavation, 125 M³ Of Excavated Filling, 35 M³ Of Sand Covering, 150 M Of Joint Sealing Sheet, 150 M Of Injection Hose Including Pressure Test, Defense Cans, 150 M Of Grouting Of Construction Joints, Approx. 1,502 M² Of Perimeter Insulation, 145 M² Of Fleece-Laminated Dimpled Membrane, + Drainage Panels ;145 M² Bitumen Solution Primer Including. Clean The Substrate, 145 M² Bitumen Welding Membrane, 11 M³ Of Seepage Packing Delivered, Installed, 112 M Filter Fleece, 112 M Flex. Drainage Pipe, 2 Control Shafts, 156 M³ In-Situ Concrete Outer Wall Incl. Formwork Outer Wall, Approx. 22 M³ Outer Supports, 13 M³ Parapet In-Situ Concrete Incl. Formwork , 48 M³ Inner Wall Of In-Situ Concrete Including Formwork, Approx. 68 M³ Of In-Situ Concrete Ceiling Incl. Formwork; 54 T Of Reinforcing Steel Bars, 16 T Of Reinforcing Steel Mesh, 1 External Distribution Column + 35 M Cable, Approx. 140 M Symmetrical External Cable, Approx. 100 M Electrical Installation Pipe, 3 Pcs Distribution Box, 30 Pcs Measuring/Testing Data Connection, 25 M Cable, 50 M Dismantling Of Existing Cable, 610 M Foundation Earth, 54 Pcs Connection Lugs, 3 Pcs Connection To Potential Control, 290 M Ring Earth Earth, 26 Pcs Connection Lugs, Approx. 127 M Solid Wall Pipes, Waste Water Including Branch, Double Sockets, 9 Pcs Floor Drain. The Execution Must Begin: Within 12 Working Days Of Receipt The Request By The Client (§5 Para. 2 Sentence 2 Vob/B); The Request Will Come To You In Advance. To Be Received By September 19, 2024. The Service Must Be Completed (Ready For Acceptance): Within 60 Working Days Of The Deadline Specified Above For The Start Of Execution. At 6 Working Days/Week. “Special Note Regarding Bidding Questions Due To Special External Events (E.G. Sars-Cov-2 Or Ukraine War): When Preparing Your Offer, Please Take Into Account Any Possible Or Recognizable Impairments, E.G. With Regard To The Availability Of Materials And Products, Workers, A Possible... . Delayed Provision Of Required Evidence, Effects On Any Subcontractors, Etc. We Ask That Any Questions That Arise In This Context Be Asked In Good Time Before The Offer Deadline Via The E-Procurement Messaging System.”
|