landstrøm Kai 01N And 02N . Srh Plans To Establish A Shore Power Supply In Mekjarvik For Quays 01N And 02N. The Plant Will Mainly Supply Supply Vessels For The Oil Industry, Crane Ships And Cargo Ships. The Facility Must Be Able To Supply Up To Three Ships At The Same Time, And Each Ship Must Be Able To Be Supplied With Up To 1,000 Kw, But The Total Simultaneous Withdrawal From All Three Ships Does Not Exceed 2,000 Kw Due To Limitations In The Overhead Grid. The Land Power Plant Will Have To Be Connected On Terms Until The New Harestad Transformer Station And The Overlying 132 Kv Regional Grid Are Completed, Tentatively Planned For 2029.