1. The Subject Of The Order Is The Reconstruction Of Rooms On The Second Floor Of Building A, Including The Construction Of A New Air Conditioning System And The Reconstruction Of The Ventilation System For Part Of Building A.2. The Subject Of The Contract Includes Works, Works And Deliveries In The Following Scope: 1) Reconstruction Of Building A And The Adjacent Garage Building Of The University Of Economics In Poznań In Accordance With The Design Documentation Entitled: Reconstruction Of Premises On The Ground Level, 2Nd And 3Rd Floor Of Building A, University Of Economics In Poznań At Al. Niepodległości 10, Including The Construction Of A New Air Conditioning For Part Of Building A And Reconstruction Of The Ventilation Installation For The Kitchen Area And Lecture Room In The Ground Ground Of Building A” By Biproinstal Rafał Marciniak From December 20232) Reconstruction Of The Existing Kitchen Ventilation Automation System And Construction Of A New System Automation For Chilled Water Machine Room In Accordance With The Technical Automation Designs Developed By Bcd Automatyka, Which Supplement The Design Documentation Prepared By Biproinstal (See Scope A) And Based On The Necessary Workshop Designs And Arrangements With The Ordering Party (See Scope C).3) Execution Of Works Supplementary For Scope A And B, Consisting In Developing Workshop Designs, Agreeing Them With The Ordering Party And The Authors Supervision, And On Their Basis, Carrying Out Construction, Installation, Assembly, Programming Works And Supplies Of Equipment.4) Preparation And Submission Of 2 Copies Of Collective As-Built Documentation In Paper And Electronic (Editable And Non-Editable Files) For Construction And Installation Works Carried Out By The Contractor Within Scope A, B And C, Divided Into As-Built Documentation Prepared On The Basis Of The Construction Design (2 Copies) - To Report The Completion Of Construction Works And As-Built Documentation Prepared On The Basis Of Technical Implementation Designs Provided By The Ordering Party And Workshop Designs Developed By The Contractor (2 Copies), In Accordance With The Detailed Requirements Set Out In Annex No. 12 To Swz.5) Carrying Out By The Contractor, At The Expense And Effort Of The Contractor, Of All Necessary Tests, Measurements And Checks Confirming Correct Operation And Achieving The Designed Parameters Of The Constructed And Reconstructed Installations, Including The Provision Of Measuring Devices And The Provision Of Devices Simulating The Operation Of Automation Elements, In Order To Confirm The Correctness Of The Constructed, Reconstructed And Delivered Automation Systems As Well As The Installation And Cabling Systems Of The Computer Network And The Access Control System.6) Carrying Out By The Contractor, At The Expense And Effort Of The Contractor, Based On The Power Of Attorney Issued By The Ordering Party For The Proceedings In The Office Of Technical Inspection Regarding The Notification Of Chilled Water Machine Room Devices Subject To Technical Supervision And Obtaining A Decision Authorizing The Operation Of These Devices And The Chilled Water Machine Room As A Set Of Devices, Including The Provision By The Contractor Own Efforts And At Its Own Expense, Conduct A Conformity Assessment By The Appropriate Notified Body In Accordance With The Pressure Equipment Directive, Ending With The Issuance Of A Declaration Of Conformity For The Set Of Devices Constituting The Chilled Water Engine Room Installation, Along With The Preparation By The Contractor Of All Necessary Documents To Carry Out The Above-Mentioned. Procedures And Providing A Copy Of The Above-Mentioned Documents And Copies Of Correspondence From The Office Of Technical Inspection To The Ordering Party, As Well As Notification Of The Completion Of Construction And The Intention To Use The Facility After Reconstruction To The State Sanitary Inspection And The State Fire Service, And After The Above Institutions Take Positions Or There Is No Objection From These Institutions, Forwarding The Notification Of Completion Of Construction To The Construction Supervision Authority And Obtaining An Appropriate Decision From The Construction Supervision In The Matter In Question, Along With The Preparation By The Contractor Of All Necessary Documents To Carry Out The Above-Mentioned. Procedures And Providing A Copy Of The Above-Mentioned Documents And Copies Of Correspondence With The Above-Mentioned Institutions To The Ordering Party. Note: Construction And Installation Works Will Be Carried Out In And Next To A Public Utility Building (University), Not Excluded From Use, Entered In The Register Of Immovable Monuments Under No. A 226, By Decision Of March 20, 19803. The Scope Of Work Includes In Particular: 1) Reconstruction Of The Existing Mechanical Ventilation System For The Kitchen And Lecture Hall 0011, Including: - Separation Of The Ventilation System Of Lecture Hall 0011 From The Kitchen Ventilation System With The Installation Of A New Supply And Exhaust Ventilation Unit With A Heat Pump, Along With The Construction Of New Intake And Exhaust Vents And Implementation Of Extensive Automation Ensuring Comfort And Economical Use Of Ventilation Depending On The Number Of People In The Lecture Room, - Replacement Of The Existing Exhaust Fan From Kitchen Hoods, - Installation Of A New Exhaust Duct Above The Roof Of The Building From Kitchen Hoods Using A Chimney System Mounted On The Facade, - Replacement Main Kitchen Hoods Into System Hoods With A Triple Filtration System, - Disassembly Of 2 Smaller Hoods In The Kitchen Area, - Reconstruction Of The Existing Kitchen Ventilation Automation System, Taking Into Account The Reconstruction And Taking Into Account The Dismantled And Newly Installed Devices. 2) Reconstruction Of Rooms In The So-Called It Center On The 2Nd Floor Of Building A, Including The Implementation Of: - New Floors, Ceilings, Doors And Finishing Works, - General Renovation Of Toilets, - Dedicated Exhaust And Supply And Exhaust Ventilation Systems With Associated Automation, - Air Conditioning System Based On A Chilled Water System With Associated Automation, - Replacement Of All Radiators Of The Central Heating System, - Reconstruction And Expansion Of Existing Fire Protection Systems, Access Control, Structured Cabling System, Electrical And Low-Current Installations. The Ordering Party Requires The Contractor To Obtain And Provide The Ordering Party With At Least A 25-Year Manufacturers System Warranty For The Entire Transmission System In The Scope Of The Rebuilt Structured Cabling System. The Contractor Is Obliged To Meet All Requirements Imposed By The System Manufacturer On Installers Performing The Work - Furniture Installations, Delivery Of Furniture And Equipment, 3) Reconstruction Of Rooms At The Ground Level In Building A, Including The Construction Of A New Refrigeration (Air-Conditioning) Engine Room In The Scope Of Stage I Along With The Associated Automation And A Ventilation Engine Room With A New Air Handling Unit With The Associated Automation For Lecture Room 0011 And A New Exhaust Fan For Kitchen Hoods, With The Necessary Expansion Of The Electrical Power Supply, Reconstruction Of The Existing Fire Protection Systems, Access Control, Low-Current Electrical Installation And Reconstruction Of The Existing Gas Installation.4) Installation Of Fan Coolers (So-Called Dry Coolers) On The Roof Of The Adjacent Garage For The Air Conditioning System In The First Stage Along With The Substructure And Earthworks, Including: On Laying Glycol Pipelines And Cabling In The Ground Between Building A And The Garage. A Detailed Description Of The Subject Of The Order Is Specified In Annex No. 11 To The Swz
|