1. The Subject Of The Order Is The Renovation Of Rooms Intended For Organizing Kindergarten Classes At The Primary School No. 2 In Dąbrowa Leśna, Łomianki Commune And At The Primary School In Dziekanów Leśny, Łomianki Commune. 2. The Renovation Will Involve The Use Of Mineral Wool And Plasterboard Wall Cladding On A Steel Structure, Replacing Doors To Rooms With A Fire Resistance Class Of Ei30, Making Installation Culverts In The Walls And In The Ceiling With A Fire Resistance Of Ei120 For The Walls And Ei60 For The Ceiling, Installation Of Fire Cut-Off Flaps With Fire Resistance Class Eis120. 3. Renovation Of Rooms At Primary School No. 2 In Dąbrowa Leśna Includes: 1) Securing And Preparing The Place Of Work; 2) Rearranging And Securing Furniture And Equipment Colliding With The Work Zone; 3) Preparation And Placement Of A Construction Waste Container (Or Big Bag) At The School, According To Needs; 4) Replacement Of Doors To Two Rooms In Which Kindergarten Classes Are Located - 3 Sets Of Fire Resistance Class Ei30, The Doors Should Be Equipped With Door Closers; 5) Installation Of Cut-Off Fire Dampers With Fire Resistance Class Ei120 In Two Rooms On The Ventilation Ducts And Their Connection To Electrical Installation For The Electrical Switchboard6) Construction Of A Platform Under The Window Outside The Building For Each Of The Departments, In Accordance With The Regulations In This Regard, I.E. The Height Of The Lower Edge Of The Window From The Platform Cannot Exceed 90 Cm;7) Construction Of A Suspended Ceiling After Carrying Out Works Related To The Construction Of New Plasterboard Walls; 8) Cladding The Walls From The Inside In Order To Increase The Fire Resistance Of The Walls (Construction Of The Structure, Covering With Non-Flammable Mineral Wool, Installation Of Non-Flammable Surface Boards, Filling, Plastering, Preparing The Walls For Painting) 9) Construction Of Installation Culverts In The Walls And In The Ceiling Of The Fire Partition With A Fire Resistance Class Ei30 (Walls), Ei60 (Ceiling); 10) Execution Of Electrical Installation Works According To Needs (Moving Lighting Lamps, Moving Electrical Sockets, Moving Light Switches)11) Painting Rooms; 12) Other General Construction Works; 13) Washing And Cleaning After Work; 14) Preparation And Delivery To The Ordering Party Of As-Built Documentation For The Completed Works, Including Certificates For Built-In Building Materials, Certificates For Fire Resistance Classes, Safety Measurements Of Electrical Installations Subject To Modernization, Tests Of Operation Of Fire Cut-Off Dampers. 15) The Detailed Scope Of Works Is Described By: • Designed Contractual Provisions (Template Contract);• Technical Opinion On Fire Protection Conditions - Prepared In April 2021; • Bill Of Quantities – As An Auxiliary Document. 4. Renovation Of The Rooms At The Primary School In Dziekanów Leśny Includes: 1) Securing And Preparing The Work Site2) Rearranging And Securing Furniture And Equipment Colliding With The Work Area3) Preparing And Placing A Construction Waste Container (Or Big-Bag) At The School, According To . Needs 4) Adaptation Of The Existing Canteen On The Ground Floor To A Kindergarten Section; 5) Installation Of Doors With Fire Resistance Class Ei30 To Two Rooms Of Kindergarten Classes (One Class - An Existing Room, The Second Class - A Room To Adapt The Existing Canteen), The Doors Should Be Equipped With Door Closers ; 6) Construction Of A Platform Under The Window Outside The Building For Each Of The Departments, In Accordance With The Regulations In This Regard, I.E. The Height Of The Lower Edge Of The Window From The Platform Cannot Exceed 90 Cm; 7) Dismantling The Existing Partition Walls In One Of The Rooms Intended For The Kindergarten Department; 8) Covering The Walls From The Inside In Order To Increase The Fire Resistance Of The Walls (Construction Of The Structure, Covering With Non-Flammable Mineral Wool, Installation Of Non-Flammable Surface Boards, Filling, Plastering, Preparing The Walls For Painting). Execution Of Electrical Installation Works According To Needs (Moving Lamps, Moving Electrical Sockets, Moving Light Switches); 9) Adaptation Of The Room Intended For The Canteen (Room On The Second Floor Of The School With Facilities); 10) Construction Of Water And Sewage Connections As Well As The Connection And Switchgear Supplying The Canteen With Electricity. Construction Of Floor Drains For Drainage Of The Kitchen Canteen Facilities; 11) Construction Of A Gravity Ventilation System In The Room Intended For The Canteen, Construction Of A Mechanical Ventilation System In The Room Intended For The Kitchen Facilities Of The Canteen; 12) Preparation Of The Subfloor And Construction Of Floors With Stoneware Tiles Together With A Tile Plinth In The Dining Room, Construction Of Walls With Stoneware Tiles And Floors With Stoneware Tiles In The Kitchen Facilities Of The Canteen; 13) Painting Rooms After Completed Works; 14) Execution Of Electrical And Lighting Installations, Lighting Lamps Should Be Equipped With Energy-Saving Led Lamps Technology; 15) Other General Construction Works; 16) Washing And Cleaning After Work; 17) Preparation And Delivery To The Ordering Party Of As-Built Documentation For The Completed Works, Including Certificates For Built-In Building Materials, Certificates For Fire Resistance Classes, Safety Measurements Of Electrical Installations Subject To Modernization, Chimney Sweep Inspection Of The Ventilation System In The Canteen Area And Kitchen Facilities; 18) The Detailed Scope Of Works Is Described By: • Designed Contractual Provisions (Contract Template); • Technical Opinion On Fire Protection Conditions - Prepared In April 2021; • Concept Of The Dining Room And Kitchen Facilities; • Bill Of Quantities - Supporting Document. A Detailed Description And Method Of Execution Of The Order Is Included In The Description Of The Subject Of The Order Constituting Annex No. 3 To The Swz.
|