Construction Site Administration Construction Site Administration - 8 Months, Structural Containment Project / Exclusive Canal Tracing Paper Percussion Probing With Standard Penetration Test (Spt) - (Fixed Cost), Percussion Probing With Standard Penetration Test (Spt), Diameter 2.1/2 Exclusive Mobilization And Percussion Probing With Standard Penetration Test (Spt), Diameter 2.1/2, Exclusive Mobilization And Demobilization, Supply And Installation Of Construction Site With Galvanized Sheet Office On Construction Site Made Of Plywood Sheet, Furniture And Equipment Not Included. Af_02/2016, Execution Of Toilet And Changing Room Execution Of Toilet And Changing Room On Construction Site Made Of Plywood Sheet, Furniture Not Included. Af_02/2016, Open Air Vertical Excavation, In Infrastructure Works, Including Loading, Unloading And Transport, In 1St Category Soil With Hydraulic Excavator (Bucket: 0.8 M³ / 111 Hp), Fleet Of 3 14 M³ Dump Trucks , Dmt Up To 1 Km And Average Speed 14Km/H. Af_05/2020, Execution And Compaction Of Landfill With Predominantly Clayey Soil - Exclusive Soil, Excavation, Ca Execution And Compaction Of Landfill With Predominantly Clayey Soil - Exclusive Soil, Loading And Transport. Af_11/2019, Bucket: 1.2M³ Open Air Vertical Excavation, Dmt Up To 1 Km And Average Speed1 Hydraulic (Bucket: 1.2 M³ / 155Hp), Fleet Of 10 Dump Trucks Of 14 M³, Dmt Of 6 Km And Speed Average22km/H. Af_05/2020, Concrete Pipe For Rainwater Collection Networks, 400Mm Diameter, Rigid Joint, Installed Concrete Pipe For Rainwater Collection Networks, Installed In A Location With A Low Level Of Interference-Supply And Settlement. Af_12/2015, Diameter 600Mm, Mechanized Excavation Of Trench With A Depth Greater Than 1.5M Up To 3.0M (Average Upstream And Downstream/One Mechanized Excavation Of Trench With A Depth Greater Than 1.0M (Average Upstream And Downstream/One Composition Per Section), Retro Excavation (0.26M3), Width Of 0.8 M To 1.5M, In 1St Category Soil, Locations With Low Level Of Interference. : 0.26M³ / Power Mechanized Trench Backfill With Retro Excavator (Retro Bucket Capacity: 0.26M³ / Power: 88Hp), 8 To 1, Depth Of 1.5 To 3.0M, With Soil (Without Replacement) Of 1St Category, With Percussion Soil Compactor, Concrete Guide (Curb) And Gutter, Molded In Place Into A Curved Section With Extruder, 45C Concrete Guide (Curb) And Gutter, 45Cm Base (15Cm Base Guide + 30 Cm Gutter Base) Af_08/2021 Pre-Cast Concrete Half-Cane Channel (D 40 Cm)-Supply And Installation. Af_08/2021, Hydraulic Ladder, Width Up To 1M, Cutting Or Landfill Water Descent Type In Steps (Dcd02, 04 E Hydraulic Ladder, 04 E Dad 02), In Machined Concrete, Fck20mpa, Launched With Pump, Including Frame, Materials And Forms (3 Uses). Af_08/2022, Dissipation Basin,
|