Construction Work – Reconstruction And Expansion Of The District Indoor Swimming Pool In Biłgoraj - Stage Ii. 4.1 The Subject Of The Order Is The Reconstruction And Expansion Of The District Indoor Swimming Pool In Biłgoraj - Stage Ii 4.2 The Scope Of The Order Includes The Implementation Of Stage Ii, Including In Particular: 1) Cutting Off The Installation Of The Existing Indoor Swimming Pool Building, 2) Demolition And Preparatory Works Of The Existing Indoor Swimming Pool / Demolition Of The Roof Of The Swimming Pool Hall , 3) Demolition Of The Upper Structure Of The Flat Roof Above The Back-Up Part, Construction And Installation Demolition Of Elements Unnecessary For The Planned, Rebuilt Facility, 4) Basic And Comprehensive Construction And Installation Works Related To The Reconstruction Of The Swimming Pool Hall And The Remaining Part Of The Existing Facility, 5) Construction Of The Newly Designed Part Of The Extension From The Side Northern, 6) Comprehensive Construction And Final Finishing And Equipment Of The Swimming Pool Hall And The Remaining Part Of The Facility Along With The Sub-Basin, 7) Works Not Performed In Stage I, Which Should Be Additionally Performed In Stage Ii: A) Priming And Facing The Walls Of The Slide Staircase With Ceramic Tiles Water In The Amount Of - 130.05 M2, B) Execution (In The Room No. 1.57 – 1.59) Two Partition Walls With A Thickness Of 11.5 Cm. Made Of Ceramic Hollow Bricks In The Amount Of 10.66 M2, Plastered On Both Sides, Primed And Painted Twice With Acrylic Paints, C) Construction Of A Section Of The Access Road From The Eastern Side (Longitudinal Profile A-B Along The Length - Kilometer From 0+023.86 To 0+045.31) Along With The Construction Of A Sidewalk Along This Length In Accordance With The Technical Design Of Roads And Accesses, 8) After The Completion Of Stage Ii Works - Reconstruction Of The Completed Part Of Stage I, Consisting Of: Dismantling The Fire Protection Wall. Separating Stage I From Stage Ii, Liquidation Of The Cloakroom And Sanitary Facilities And Construction Of A Final Sauna In Its Place, Dismantling The Temporary Floor For The Braking Bathtub, Dismantling The Temporary External Steel Entrance Stairs Together With The Foundations And Construction Of The Internal Part Of The Water Slides With The Braking Bathtub, Including: A Steel Spiral Cage Staircase With Starting Elements Made On A Pole Fixed In The Foundation, Forging 4 Holes In The External Wall To Allow The Slides To Pass Through The Wall, Along With Finishing The Places Where The Slide Passes Through The Building Partitions, Electric Power Supply, Start-Stop System And Integrating It With The Water Supply System For The Slide , Launch Of The Water Installation Supplying Water To The Slide, Launch Of Multimedia, Instructions For Using The Slide In The Form Of Information Boards, Assembly Of The Last Sections Of Slides (Inlet And Outlet) Provided By The Ordering Party, Configuration Of The Entire Slide System With A Dynamometer And Final Launch Of The Slide, 9) After Completing These Works, Connecting The Sports Swimming Pool Hall Constructed As Part Of Stage Ii With The Recreational Swimming Pool Hall - To Obtain The Target Facility Of A Rebuilt And Expanded Indoor Swimming Pool Along With Obtaining A Non-Final Occupancy Permit For The Entire Facility (Stages I And Ii), 10) Carrying Out Restoration Works, Replacement In
|