Substation Construction Work – Kaposfüred Substation Expansion. Within The Scope Of The Contract, Within The Framework Of The Extension Of The 132/25 Kv Máv Substation In Kaposfüred In The Area Of E.On Dél-Danunátúli Áramhárosáti Zrt., The Tasks Of The Successful Bidder Are To Implement The Implementation Of The Implementation Plan Documentation As Follows: - Kaposvár 1-2. Reconstruction Of The 132 Kv Transmission Line Field (Demolition Of Old Concrete Device Bases And Concreting Of New Device Bases And Electrical Construction, Which Includes Electrical And Mechanical Demolition Of Old Electrical Devices And Mechanical Installation And Electrical Construction Of New Devices); - Reconstruction Of The 132 Kv Busbar Field (Demolition Of Old Concrete Device Bases And Concreting Of New Device Bases And Electrical Construction, Which Includes Electrical And Mechanical Demolition Of Old Electrical Devices And Mechanical Installation And Electrical Construction Of New Devices); - I-Ii. Construction Of 132/22 Kv Transformer Fields (Concreting Of Equipment Foundations, Construction Of A Concrete Basin For Transformer And Cspk Fields And Electrical Construction, Which Includes The Mechanical Installation And Electrical Construction Of New Devices) With 22 Kv Star Point Forming Fields; - Construction Of A Switching And Control Building With A Floor Area Of 369.62 M2; - Construction And Expansion Of The Device And Transformer Transport Road; - Installation And Electrical Installation Of 25 Indoor 22 Kv Encapsulated Switchgear; - Construction Of 1 Hydrocarbon Separation System; - Installation And Electrical Installation Of A 220 V Battery And Charger; - Installation And Electrical Installation Of Direct And Alternating Current Auxiliary Operating Equipment; - Placing The Cabinets Containing The New Protection And Control Technical Systems In The New Switch And Control Building, As Well As In The Open Space. - Building A Protection, Control And Secondary System In Accordance With The Iec 61850 Standard, Creating A Data Transmission System And A Structured Network, As Well As Connecting It To The External Optical Network. - Construction Of Urh And Telemechanics Systems In Order To Ensure The Necessary Substation Communication. - Space Lighting And Lightning Protection, As Well As Expansion Of The Grounding Network. - Secondary Reconstruction Due To The Construction Of The Optical Section Protection In The Kaposvár 132/22 Kv Substation In The Kaposfüred 1. And Kaposfüred 2. Transmission Line Fields Due To The Replacement Of The Section Protection Devices In Pairs. The Data And Information Described In Points Ii.1.4) And Ii.2.4) Of The Invitation Are Of An Informative Nature, The Detailed Conditions Are Recorded In The Draft Contract And The Technical Description. Further Detailed Description Of The Task Is Contained In The Public Procurement Documents. The Bidder Provides A Reserve Limit, The Amount Of Which Is 10% Of The Lump Sum Bid Price, Subject To Art. 322/2015. (X. 30.) To The Provisions Of § 20 Of The Government Decree.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79664036
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.