Creation Of The Crane Foundation With Ready-To-Use Installation Of The Tower Crane Liebherr 300 Ec-B 12 Or Similar. (Foundation Anchors, Abb) And Construction Of A Deep Foundation (16 Micropiles With Empty Holes). This Includes Setting Up The Construction Site With The Dismantling Of Various Existing Elements (5 Natural Stone Bollards), As Well As An Exploration For Explosives And The Production Of A Shoring (Support Pile Wall, 12 Shoring Beams, Set In Cased Boreholes) To Secure The Excavation Pit. The Local Constraints And Difficulties Are Pointed Out: The Construction Site Is Located Within The Pedestrian Zone (Environmental Zone, Overhead Lines, Application For Parking Concessions, Vandalism,) And Is Surrounded By Listed Buildings (Requirements: Low Noise And Vibration). An Interruption Of The Excavation Due To Archaeological Measures Cannot Be Ruled Out. There Is Only A Very Limited Working Space Available For The Production Of The Micropiles And The Assembly Of The Construction Crane.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79569070
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.