Catenarys Construction Works – Fixed Electric Traction Installations At The South Workshop In Rodange - Application Phase. The Mission Consists Of The Installation Of Retractable Catenaries And Its Integration Into The Interlocking Principles (Programmable Controllers) Of The Future Railway Workshop In Rodange. • Development Of The Concept Of Retractable Catenaries For The Interior Of The Hall Taking Into Account The Interfaces With The External Catenary Part • Development Of The Principle Of Switching On The Programmable Controllers And Their Interfacing With The Technical Installations (Cutting Devices, Overhead Crane, Lifting Installation , Retractable Catenary, Etc.) • Risk Analysis And Determination Of The Functional Safety Level Of The Catenary Control (Performance Level According To En 13849-1) In Coordination With The Cfl. • Establishment Of Safety Studies And Files Necessary To Obtain Certification • Establishment Of Detailed Preliminary Project Plans (Catenary, Eale, Return Circuit, Cable Route) • Establishment Of The Execution Study • Coordination And Exchanges With The Project Stakeholders (Work Platforms, Lifting Installations, Overhead Cranes, Technical Engineering, Civil Engineering, Etc.) • Supply And Installation Of The Necessary Equipment (Retractable Catenaries, Controls, Programmable Controller, Etc.) • Assistance, Advice And Various Expertise According To Requests Specified By The Cfl, • Integration Of The Industrial Programmable Controller System, This List Is Not Exhaustive, Other Services May Be Considered During The Mission.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79560689
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.