Air-Conditioning Installation Work – Refrigeration Systems According To Din 18379. In The Third Phase Of The Energy Renovation Measure, The Administrative Wing Of The Sports Performance Center In Hanover Will Be Renovated And Restructured. Two Panel Coolers Will Be Installed On The Roof Of The Second Floor; These Will Supply Two Internal Cooling Machines And A 1500 Liter Cold Storage Tank. The Ceiling Cassettes In The Third Construction Phase Are Supplied Via Steel Pipelines. 2 Panel Coolers, Each With Approx. 97 Kw Re-Cooling Capacity; 2 Chillers Approx. 83 Kw; 2 Glycol Trays; 26 Ceiling Cassettes 1-6 Kw; 1 Cold Storage 1500L; 400M Steel Pipeline Up To Dn 100
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79560595
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.