Reconstruction Of A Sewage Treatment Plant With The Construction Of A Sanitary Sewage System In The Town Of Wólka Cycowska The Subject Of The Order Is To Provide The Ordering Party, In Accordance With The Functional And Utility Program, With A Service Consisting In The Design And Reconstruction Of A Sewage Treatment Plant In The Town Of Wólka Cycowska, Cyców Commune, Together With The Accompanying Infrastructure In The Area Sewage Treatment Plant And The Pressure Sewage Network And Connections. The Receiver Of Treated Sewage Is The Świnka River. The Scope Of The Order Includes The Design And Construction Of A Complete Sewage Collection System (Network With Connections) And The Reconstruction Of A Sewage Treatment Plant Operating In Rotating Bed Technology Along With The Accompanying Infrastructure. The Sewage Treatment Plant Facilities Should Be Located Within Plot 547/3, On The Border Of The Fenced Part Of The Plot. The Entire Area Of Plot No. 547/3 Consists Of The Sewage Treatment Plant Area And The Access Road From The Municipal Road. The Area Of The Fenced Area Of The Sewage Treatment Plant Is 0.07 Ha, And The Entire Plot No. 547/3 Is 0.22 Ha. Access To The Treatment Plant Facilities Is Provided From The Municipal Road, Which Is Plot No. 34. The Detailed Scope Of Works Includes The Construction Of: I. A Pressure Sewage Network With Connections Within The Boundaries Of The Plots For Which The Investor Has Legal Title, Along With Complete Individual Sewage Pumping Stations (Approx. 40 Pcs. ): Pressure Sewage Network Made Of Pe100 D75x4.5Mm Pipes, Approximately 1854M Long Pressure Sewage Network Made Of Pe100 D90x5.4Mm Pipes, Approximately 704M Long Pressure Sewage Network Made Of Pe100 D110x6.6Mm Pipes, Approximately 328M Long Sewage Connections Pressure Pipes Made Of Pe100 D63x3.8Mm Pipes, Approximately 327M Long Individual Monolithic Pumping Stations, 40 Pcs. I. Variant Reconstruction Of The Sewage Treatment Plant In The Town Of Wólka Cycowska Variant I Reconstruction Of The Raw Sewage Pumping Station Construction Of A Mechanical Sewage Treatment Unit - A Sand Trap Room, Construction Of A Sedimentation Tank Primary, Construction Of A Biological Treatment Center - Rotating Biological Bed Technology, Construction Of A Secondary Settling Tank With Recirculation, Construction Of A Point For Measuring The Amount Of Discharged Treated Sewage, Reconstruction Of The Existing Excess Sludge Stabilization Tank, Reconstruction Of The Existing Storage Room. Blowers For The Needs Of The New Sewage Treatment Plant Development Of The Area, Including The Development Of Cables And Channels Between Facilities, Reconstruction Of The Power Connection, If Required, Lighting Of The Treatment Plant Area Renovation Of The Duty Room With Development Of The Treatment Plant Control System Construction Of An Internal Road With Paving Stones Carrying Out All Necessary Studies Required For The Implementation Of The Investment, Including Maps For Design Purposes, Geotechnical Or Geological-Engineering Documentation (If Necessary) Taking Into Account Hydrogeological Conditions, Greenery Inventory, Designs Of All Industries And Required Accompanying Studies, Obtaining The Necessary Decisions And Arrangements, Including Environmental Decisions Conditions Of Consent To Implement The Project, Water And Legal Permit Decisions, Building Permits And Occupancy Permits. The Detailed Scope Of Design And Implementation Works Necessary To Complete The Order Is Specified In The Fup In Question.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79536816
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.