1. The Subject Of The Order Is The Development Of Design Documentation, Obtaining Appropriate Permits For The Implementation Of Construction Works, Carrying Out Authors Supervision And Carrying Out Construction Works Consisting In The Modernization Of Ul. On The Basis Of The Prepared Documentation. Bolesław Krzywousty In Rydułtowy, Implemented Under The Design And Build Procedure. The Investment Was Included For Implementation Under The Government Fund Polish Order: Strategic Investment Program Program.2. The Scope Of The Order Includes: 1) Preparation Of Design Documentation For The Modernization Of Ul. Bolesław Krzywousty In Rydułtowy To The Extent Enabling Obtaining Appropriate Permits For The Implementation Of Works And Construction Works, Including Authors Supervision. The Documentation Should Be Prepared Based On The Functional And Utility Program In The Possession Of The Ordering Party Regarding: A) Modernization Of Ul. Bolesława Krzywoustego (Municipal Road 460012S):• Length Of The Modernized Section: 350.00 M• Width Of The Modernized Section: 4.00 M• Roadway Made Of Concrete Cubes With Substructure - Estimated Quantity 1,400.00 M2• Concrete Curbs (With Granite Curbs Allowed) Over A Length Of 700 M • Hardened Roadsideb) Construction Of A Rainwater Drainage System Along The Street. Bolesław Krzywousty:• Length Of The Storm Sewerage Network 731 M.• Sewage Wells - Estimated Number 32 Sets. Roadside Ditches/French Drainage Along The Street. Bolesław Krzywousty:• Length Of Roadside Ditches: 640 M (Including Sections Of French Drains Described Below)• Roadside Ditches, Earthen, Open Bed• Protection: Bottoms Of Ditches - Concrete Beds (Over A Length Of 640 M), Edges Of Ditches - None, Earth Covered With Grass • Drainage Pipes: Material Protected With Coconut, High Permeability Road Crushed Stone Backfill • Total Length Of Drainage Sections 256 Mbd) Construction Of Road Lighting At The Intersection With Ul. Radoszowska In Order To Illuminate The Pedestrian Crossing Along With Marking The Crossing For Visually Impaired People: • Electrical Connection • Two Poles With Led Luminaires, The Poles Should Be Equipped With Luminaires With Led Sources With Appropriate Optics, Power Of 40W, • After Switching On At Night, The Luminaires Have Shine With Power Reduced To The Rated Power Of The Luminaires. • Two Motion Detectors On Lighting Poles To Detect The Presence Of Pedestrians • Marking Pedestrian Crossings Will Consist In: - Placing 80 Cm Wide Warning Strips Directly At The Edge Of The Sidewalk (Behind The Curb) On Both Sides Of The Crossings Along Their Entire Width, Made Of Yellow Integrated Concrete Paving Stones, 8 Cm Thick; - Laying Guide Strips (Which Will Connect With Warning Stripes Perpendicularly) Made Of Grooved Concrete Cubes 30X30 Cm Yellow, 8 Cm Thick, Made Over The Entire Width Sidewalk; 2) Carrying Out Construction And Demolition Works Based On The Prepared Design Documentation To The Extent Enabling The Use Of The Constructed And Rebuilt Facilities In Accordance With Their Intended Purpose.3. The Scope Of The Construction Project Includes, Among Others: 1) Demolition And Dismantling, 2) Construction Works, Including: Road, Sewage And Electrical Works, 3) Inventory Of Greenery And Cutting Down Of Trees And Shrubs Colliding With The Investment, Along With Plantings If Necessary, 4) Reconstruction And/Or Protection Of Existing Infrastructure, Including The Media Network In Conflict With The Planned Project, 5) Reconstruction Works Of Existing Surfaces (Exits, Road In The Rainwater Drainage Zone Running In The Road), 6) Reconstruction Of Fences Colliding With The Investment, If Necessary.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79485056
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.