The Subject Of The Order Are Construction Works - Electrical Installation And Telecommunications, Together With Accompanying Works On The Ground Floor Of The Laboratory Building And The Replacement Of Current Transformers In The G254 Transformer Station. The Scope Of Works In The Electrical Industry Includes: Internal Electrical Installations, Installation Of Basic Lighting, Installation Of Emergency Lighting, Installation Of General Plug Sockets. Intended Use, Installation Of Plug Sockets And Electrical Switchgears (Boards) And Replacement Of Transformers In The Transformer Station. In Addition, The Correctness Of The Separation Of The Protective-Neutral Pen Conductor Into Neutral N And Protective Pe Is Checked, Plus Measurement Of The Grounding Of The N Conductor In The Main Rg Switchboard. The Scope Of Works In The Telecommunications Industry Includes: Replacement Of The Structural Network From New Sockets To The Existing Distribution Point On The Ground Floor. Accompanying Works Include : Filling In Gaps In The Plaster, Including Painting In The Rooms Covered By The Replacement Of Electrical And Telecommunications Installations, And Dismantling Redundant Existing Installations. The Detailed Scope Of Work Is Described In The Attached Design Documentation. The Scope Of Work Includes Only The Reconstruction Of The Electrical Installation In The Building. The Scope Of These Works Is Shown In The Technical Documentation1. The Contractor Should Perform All Works Described In The Design And Technical Documentation And Work Such As: A) Providing As-Built Documentation, All Certificates For Materials And Devices, B) Protecting Floors And Floors Against Damage, Dirt And Dust In Connection With The Implementation Of The Works. C) Securing Existing Equipment, Furniture, Etc. In Connection With The Implementation Of The Works, D) Securing Adjacent Rooms Against Dust In Connection With The Implementation Of The Works, E) Maintaining Order And Performing Cleaning Works On An Ongoing Basis, F) Carrying Out All Tests, Examinations, Official Acceptances Provided For By The Regulations, G) In Order To Maintain Technical Standards, The Ordering Party Recommends The Use Of Materials That Have Been Incorporated In The Electrical Installation Modernization Works Performed So Far.2. The Ordering Party Has The Right To Limit The Scope Of Works Specified In This Contract. The Ordering Party Will Notify The Contractor In Writing About The Limitation Of The Scope Of Works. If The Scope Of Works Is Limited, The Remuneration Will Be Changed By The Value Of The Unfinished Works. This Value Will Be Determined According To The Cost Estimate Prepared Based On The Prices Specified In The Contractors Offer. The Contractor Is Not Entitled To Any Claims Or Penalties Related To The Limitation Of Works By The Ordering Party. In Such A Case, The Minimum Value Of The Contractors Performance Will Not Be Lower Than 60% Of The Remuneration Referred To In § 5 Section 1 Of This Agreement. Summary Of Design Documentation: 1. Technical Designs: A. Replacement Of Electrical And Telecommunications Installations In The Gce Laboratory - Stage Ib. Replacement Of Current Transformers In The Gce2 Power Transformer Station. Technical Specification For The Execution And Acceptance Of Construction Works3. Bill Of Quantities A Detailed Description Of The Subject Of The Order Is Included In The Above-Mentioned Design Documentation, Which Constitutes Annex No. 7 To The Swattention! The Indications For Technical Devices And Materials Presented In The Above-Mentioned Documents Should Be Treated As A Reference To The Technical And Useful Parameters Expected By The Ordering Party And As Examples Due To The Principles Of The Public Procurement Law, Especially Art. 99 To 103. The Ordering Party Allows Solutions Equivalent To, But Not Inferior To, The Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Described In The Above-Mentioned Documents In Order To Achieve The Expected Functionality Of The Entire System Being The Subject Of The Order, Ensuring That All Possible Required Arrangements Are Obtained, Including Including Acceptance Of Material Changes By The Ordering Party. The Ordering Party Will Recognize Certificates Issued By Other Equivalent Conformity Assessment Bodies If Presented By The Contractor. All Technical Devices And Materials Proposed By The Contractor Must Have Technical And Functional Parameters Not Inferior To Those Described In The Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works, Which Constitute Annex No. 7 To The Swz And Have Appropriate Approvals And Certificates. The Contractor Who Proposes Use Of Solutions Or Devices Equivalent To Those Described In The Documentation, He Is Obliged To Demonstrate That The Devices He Offers Meet The Requirements Specified By The Ordering Party. Required Warranty Period: 36 Months, Max. 72 Months From The Date Of Final Acceptance Of The Works. Required Warranty Period: 36 Months, Max. 72 Months From The Date Of Final Acceptance Of The Works, The Ordering Party Requires That The Offered Warranty And Guarantee Period Be The Same.
|