Engineering Design Services – Renovation Of The Town Hall Of The Altenahr Municipality - Architect Services. A) Service Package: Renovation Of Pollutant Contamination And Gutting Heating Oil Renovation On The Ground Floor And Basement: The Architectural Work For The Heating Oil Renovation In The Basement And Ground Floor Has Already Been Commissioned To The Architectural Firm K|G Architekten For Service Phases 1-4; The Planning Has Largely Been Completed. The Corresponding Planning Documents And Cost Calculations For Service Phases 1-4 Are Available. These Are The Basis Of This Order. The Architectural Services For The Heating Oil Renovation In The Basement And Ground Floor Of Service Phases 5-9 Are The Subject Of This Tender And Are To Be Carried Out By The Contractor. Since The Architectural Firm K|G Is A Company Previously Involved In The Measure Within The Meaning Of Section 7 Vgv, We Are Also Making The Documents From The Tender For Heating Oil Renovation Available In This Tender. This Means That All Bidders Have The Same Information Base. Gutting And Dismantling: Parallel To The Heating Oil Renovation, Any Existing Furnishings And Furniture, The Surface Coverings Of The Walls And Floors, All Suspended Ceilings And Interior Doors Will Be Removed On All Floors And The Existing Building Services Installations Including All Pipes And Cabling Will Be Dismantled And Disposed Of. The Basis For The Measures To Be Carried Out Is The Report On The Chemical Assessment Of Flood Damage From Thees + Partner Office Dated November 21, 2022. Pollutant Measurements Will Be Carried Out Continuously During The Renovation. The Contractor Must Coordinate The Services Of The Specialist Planners And Experts. B) Service Package For Conversion And Expansion Planning Space Requirements: The Basement Will No Longer Be Usable In The Future Due To The Required Flood-Adapted Construction. The Building Services Rooms, Storage Areas And A Large Part Of The Archive Areas Were Housed Here. When These Areas Are Relocated To The Floors Above, The Corresponding Usable Or Office Space In These Areas Will Be Eliminated. Therefore, In The Course Of The Renovation Of The Entire Building, Compensation Must Be Created, For Example In The Rear Extension, Through Appropriate Area Optimization And Area Expansion In Conjunction With A Possible Relocation Of The Meeting Room. After The Building Has Been Completely Renovated, It Will Be Returned To Its Previous Use As An Administrative Building, As The Town Hall Of The Altenahr Municipality. Both Service Packages Should Begin At The Same Time And Be Processed By The Contractor In Parallel. A) Service Package Renovation, Pollutant Contamination And Gutting Lp5: Implementation Planning Lp6: Preparation Of The Award Lp7: Participation In The Award Lp8: Property Monitoring (Construction Supervision) And Documentation Lp9: Property Management For Special Services See Point 2.4. B) Service Package For Conversion And Expansion Planning Performance Level (Ls) 1 Lp1: Basic Determination Lp2: Preliminary Planning Lp3: Draft Planning Lp4: Approval Planning Performance Level (Ls) 2 Lp5: Execution
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79472452
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.