Construction Work For University Buildings – Painting And Varnishing Work. Overview Of Painting And Varnishing Work: - 1 Psch Of Construction Site Equipment - 1 Piece Of Mobile Scaffolding, Load Class 3 - 2 Pieces Of Room Scaffolding - 2498 M² Of Walls Covered And Masked, Foil - 825 M² Of Floor Covered And Masked, Painters Felt - 94 M Of Electrical Slots Closed - 100 M² Demolition Ceiling Coating - 1928 ² Cleaning Wall Surfaces, Coarse Dirt - 738 M² Cleaning Ceiling Surfaces, Coarse Dirt - 227 M² Wall Surfaces, Sanding By Machine - 277 M² Ceiling Surfaces, Sanding By Machine - 5979 M² Primer To Reduce Absorbency, Wall Inside - 3186 M² Primer To Reduce Absorbency, Ceiling Inside - 427 M Close Joint, Fill Offsets, Ceiling - 427 M Span Joint, Fiberglass Mesh - 193 M² Prepare Concrete Walls, Fill, Full Surface - 235 M² Prepare Concrete Ceilings, Fill, Full Surface - 109 M² Prepare Undersides Of Stairs Made Of Prefabricated Concrete Parts, Fill, Full Surface - 430 M² Lime-Cement Plaster As Wall Plaster, On Stb Q2, Felted - 430 M² Mineral Bonding Bridge - 1291 M² Additional Thickness Per 5Mm Layer Thickness /M² - 430 M² Additional For Two-Layer Version Plaster - 10 Pieces. Fire Protection Plaster Class F30-A, Din 4102-4 On Steel Supports - 4996 M² Painters Fleece, Wall, Bridging Hairline Cracks - 876 M² Painters Fleece, On Soffits Up To 30 Cm - 159 M² Painters Fleece, On Soffits Up To 60 Cm - 1855 M² Opaque Coating Wall Surfaces, Sol-Silicate Paint, Nak1 - 3904 M² Opaque Coating Wall Surfaces, Sol -Silicate Paint, Nak 2 - 908 M Opaque Coating, Reveal Up To 30 Cm - 159 M Opaque Coating, Reveal Up To 60 Cm - 86 M² Coating Acoustic Wall Surfaces, Wash-Resistant, Sol-Silicate Paint - 372 M² Intensive Color Coating, Sol-Silicate Paint - 106 M² Intensive, Dark Color Coating, Sol-Silicate Paint - 347 M² Opaque Coating, Ceiling Surface Concrete, Sol-Silicate Paint Nak 2 - 1622 M² Opaque Coating, Ceiling Surfaces Gk, Sol-Silicate Paint Nak 2 - 1564 M² Opaque Coating, Gk Acoustic Ceilings, Sol- Silicate Paint Nak 2 - 811 M Preparation Recessed Lights - 18 M² Surface Preparation Sanding - 18 M² Primer, 2K Epoxy Resin - 18 M² Primer, 2K Epoxy Resin - 18 M² Top Seal, Non-Slip, R10 - 1 Piece. Earth Connection - 7 M² Conductive Layer - 7 M² Electrically Conductive Coating, R10 - 1 Psch Measurement Of Earth Leakage Resistance - 1 Psch Measurement According To Din Vde 0100-600 - 157 M² Surface Preparation, Sanding, Outside - 157 M² Acrylate Primer - 157 M² Acrylate Coating - 126 M² Scatter Of Solid Glass Balls For Slip Resistance - 157 M² Top Sealing, Non-Slip, R10 - 17 Pieces Of Coating, Sheet Steel Door, Surrounding Frame, Kh - 159 M² Coating, Sheet Steel Railing, On Both Sides, Kh - 38 Pieces Of Coating, Primed Inspection Flaps - 7209 M Of Joint Closure, Inside, Acrylic
|