1. Type Of Order: Construction Work.2. The Subject Of The Order Is The Execution Of The Order Entitled: Construction Of Ul. Spokojna In Murowana Goślina.”3. The Subject Of The Order In The Design And Build System Includes: Complete Design And Construction Documentation And, Based On It, Execution Of Construction Works, Including The Construction Of Spokojna Street With A Connector In Murowana Goślina And The Development Of As-Built Documentation After The Completion Of Construction Works, As Well As - Throughout The Entire Implementation Period Agreements - Exercising Authors Supervision.A) Designing On The Basis Of The Functional And Utility Program With Graphic Annexes Of The Construction Of Ul. Spokojna In Murowana Goślina Developed By Konrad Furman Rufma Based In Poznań (61-625) At Ul. Hawelańska 6A/79 And Obtaining All Necessary Conditions, Arrangements And Decisions Of A Building Permit Or A Decision Authorizing The Implementation Of A Road Investment (Zrid), B) Carrying Out Construction Works On The Basis Of The Developed Construction Documentation For The Construction Of Spokojna Street Together With The Connector In Murowana Goślina And Performing Authors Supervision, C) Designing Spokojna Street As An Access Road With Traffic Category Kr3 For A Speed Of 30 Km/H And A Road Width Of 5.0 M With A Sidewalk And Stormwater Drainage, D) Also Designing A Connector To Ul. Spokojna As An Access Road With Traffic Category Kr2 For A Speed Of 30 Km/H And A Width Of 5.0 M, Ending With A Turning Area With A Rainwater Drainage System, E) Reconstruction Of Street Lighting On The Above-Mentioned Street And The Design Of A Service Channel And The Reconstruction Of All Identified Collisions With The Technical Infrastructure, F) The Study Should Include Manual Demolition Of The Existing Jumbo Panels And Storing Them On Pallets Near The Street. Spokojna And Ul. Starczanowska.4. The Subject Of The Order Is Specified In Annex No. 1 To The Siwz - Description Of The Subject Of The Order.5. The Functional And Utility Program (Hereinafter Referred To As Ffu), Constituting Annex No. 1 To The Description Of The Subject Of The Order, Constitutes The Basis For Developing The Subject Of The Order.6. Nomenclature According To The Common Procurement Vocabulary (Cpv), Subject Of The Contract Described According To The Common Procurement Vocabulary (Cpv):1) Main Subject: A) 45233120-6 - Road Construction Works2) Additional Subject: A) 71200000-0 Architectural And Similar Services, B) 71222000-0 Architectural Services Relating To Space,C) 71220000-6 Architectural Design Services,D) 71221000-3 Architectural Services Relating To Buildings,E) 71320000-7 Engineering Services Relating To Design,F) 71248000-8 Supervision Of Design And Documentation,G) 45000000-7 Construction Works,H) 45100000-8 Preparation Of Land For Construction,I) 45111200-0 Works In The Field Of Preparation Of Land For Construction And Earthworks,J) 45200000-9 Construction Works In The Field Of Erecting Complete Structures Construction Works Or Parts Thereof And Civil Engineering Works,K) 45230000-8 Construction Works In The Construction Of Pipelines, Communication And Power Lines, Highways, Roads, Airports And Railways; Land Leveling,L) 45231000-5 Construction Works In The Field Of Construction Of Pipelines, Communication Routes And Power Lines,M) 45231300-8 Construction Works In The Scope Of Construction Of Pipelines For Sewage Disposal,N) 45233000-9 Works In The Scope Of Construction, Foundations And Paving Roads, Motorways,O) 45233200-1 Works On Various Surfaces,P) 45233140-2 Road Works,Q) 45233222-1 Construction Works On Laying Pavements And Asphalting,R) 45233290-8 Installation Of Road Signs,S) 45311200- 2 Electrical Installation Works,T) 45232460-4 Sanitary Works,U) 45314300-4 Installation Of Cabling Infrastructure,V) 45316110-9 Installation Of Road Lighting Devices,W) 45316100-6 Installation Of External Lighting Devices,X) 45112710-5 Works In The Field Of Shaping Green Areas.
|