Construction Work – I / 387 Weid - Hinterthal Bridge, Muotathal / Builder. In The Area Of The Muotathal Through Town, Main Road No. 387 Is Being Completely Renovated Over A Length Of Around 2 Km. Main Volumes: Pavement Demolition Approx. 22,000 M2 Concrete Demolition Approx. 150 M3 Solid Excavation Work Route Approx. 15,000 M3 Solid Trench And Pit Excavation Approx. 7,500 M3 Of Solid Trench And Pit Shoring, Approx. 700 M2 Of Concrete (Construction, Base, Negative, Enveloping And Securing Concrete) Approx. 600 M3 Of Formwork Approx. 1,300 M2 Of Reinforcement Approx. 50 T Of In-Situ Concrete Bored Piles; 800 Mm, Total Length Approx. 200 M Micro Bored Piles; D = 60 Mm, Length Up To 6 M Approx. 250 Pieces Unbound Mixtures For Foundation Layers Approx. 22,000 M3 Loose Geosynthetics Approx. 25,000 M2 Pbd Seals Approx. 350 M2 Asphalt Concrete Coverings Approx. 11,000 T Mastic Asphalt Coverings Approx. 120 T Edge Terminations Approx. 6,250 M Street Drainage Approx. 4,200 M Shafts Including Street Collectors Approx. 250 Pieces Of Pipe Systems Trades Approx. 3,500 M
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79430401
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.