The Subject Of The Order Are The Following Works: 1) Renovation Works In Basement Rooms - Adaptation Of The Conservators Room: Comprehensive Renovation Of The Room. The Works Will Include In Particular: - Carving Out Of The Wall, Steel Door Frames - Dismantling Existing Doors, - Dismantling Partition Walls, - Building Partition Walls In Accordance With The New Room Layout, - Plastering Works, - Supplementing Concrete Floors - Renovation Of The Existing Screed, - Making A Layer Of Screed Self-Leveling - Preparing The Floor For Laying The Carpet, - Laying A Flexible, Homogeneous Pvc Floor Covering, Thickness: 2 Mm With Plinths, - Delivery And Installation Of Door Joinery, Panel Doors (Hole Board) With At Least Cpl Veneer, Steel Door Frame, - Repairing Cracks And Scratches In The Plaster, - Painting Works - Painting Walls And Ceilings, - Painting Radiators And Window Sills, - Liquidation Of Part Of The Unused Sanitary Installation, Construction Of An Approach Under The Washbasin, Delivery And Installation Of A New Washbasin, - Liquidation Of Old Mechanical Ventilation Elements Along With Removal And Disposal Of Scrap, - Removal And Disposal Of Waste And Debris Generated During Renovation Works, 2) Renovation Works In Basement Rooms - Renovation Of The Boys And Girls Locker Rooms. Comprehensive Renovation Of The Boys And Girls Locker Rooms In The Basements. The Works Will Include: - Carving Out Of The Wall, Steel Door Frames - Dismantling Existing Doors, - Dismantling Partition Walls, - Building Partition Walls In Accordance With The New Room Layout, - Plastering Works, - Supplementing Concrete Floors - Renovation Of The Existing Screed, - Making A Layer Of Self-Leveling Screed - Preparation Of The Floor For Laying The Carpet, - Laying A Flexible, Homogeneous Pvc Floor Covering, Thickness: 2 Mm With Plinths, - Delivery And Assembly Of Door Joinery, Panel Doors (Hole Slab) With At Least Cpl Veneer, Steel Door Frame, - Execution Of Floors With 60X60 Cm Stoneware Tiles In Sanitary Facilities, - Wall Cladding With 60X60 Cm Stoneware Tiles In Sanitary Facilities, - Delivery And Installation Of Door Joinery, Panel Doors (Hole Board) With At Least Cpl Veneer, Steel Door Frame, - Repairing Cracks And Scratches In The Plaster, - Painting Works - Painting Walls And Ceilings, - Painting Radiators And Window Sills, - Replacement And Expansion Of Installations Sanitary Sewage System In Accordance With The New Layout Of The Rooms, - Removal And Disposal Of Waste And Debris Generated During Renovation Works, 3) Adaptation Of The Electrical Installation To The New Arrangement Of The Ground Floor Rooms. The Works Include In Particular: - Renovation Of The Electrical Installation In The Ground Floor Part Of The Building, - It Network In Part Of The Ground Floor Of The Building, - Switching The Existing Luminaires In The Canteen To Another Circuit. The Detailed Scope Of Electrical Works Is Presented In The Bill Of Quantities For The Electrical Industry And In The Conceptual Drawing For The Rooms In The Ground Floor Part (Fig. E1).4) Painting Works And Replacement Of The Floor In The Library Room. The Works Include In Particular: - Dismantling The Existing Pvc Floor Covering, - Supplementing The Concrete Floors - Renovation Of The Existing Screed, - Making A Layer Of Self-Leveling Screed - Preparing The Floor For Laying The Carpet, - Laying The Facility Floor Covering Pvc, Flexible, Homogeneous Type With A Thickness Of 2 Mm With Plinths, - Repairing Cracks And Scratches In The Plaster, - Priming And Double Painting Walls And Ceilings, - Painting Steel Radiators With Oil Paint, - Painting Window Sills With Oil Paint, - Removal And Disposal Of Garbage Remaining After Renovation Works. Detailed Scope And Quantity Of Works Included In The Technical Documentation, Which Consists Of: 1) Bill Of Quantities - Renovation Works In Rooms - Adaptation Of The Maintenance Mans Room - Annex No. 6.1 Swz, 2) Bill Of Quantities - Renovation Works In Basement Rooms - Renovation Of The Boys And Girls Locker Rooms - Annex No. 6.2 Swz ,3) Bill Of Quantities - Adaptation Of The Electrical Installation To The New Arrangement Of The Ground Floor Rooms - Annex No. 6.3 Swz,4) Sketch Of The Electrical Installation In The Ground Floor - Annex No. 6.4 Swz,5) Bill Of Quantities - Painting Works And Replacement Of The Floor In The Library Room - Annex No. 6.5 Swz.
|