1. The Subject Of The Order Is The Implementation Of The Order Entitled: Revitalization Of Degraded Urban Areas, Within Which The Following Scope Of The Order Will Be Implemented: 1.1. Scope No. 1: Revitalization Of Degraded Urban Areas: Construction Of A Rainwater Drainage Network And Construction Of A Gravity Sanitary Sewage System With Connections In Ul. Tatrzańska In Drawsko Pomorskie” – Design And Build Formula; 1.2. Scope No. 2: Revitalization Of Degraded Urban Areas - Development Of The Area Between Ul. 11Th Infantry Regiment, Ul. Zamkowa, Ul. Sybiraków, Ul. Bednarska In Drawsko Pomorskie” – In Accordance With The Attached Design Documentation.2. The Order Is Co-Financed By The Government Fund Polish Order Strategic Investment Program.3. The Planned Scope Of The Order Includes: 3.1. Scope No. 1: Revitalization Of Degraded Urban Areas: Construction Of A Rainwater Drainage Network And Construction Of A Gravity Sanitary Sewage System With Connections In Ul. Tatrzańska In Drawsko Pomorskie” – In The “Design And Build” Formula:3.1.1. The Subject Of The Contract In Scope No. 1 Is The Design And Construction Of Sanitary And Rainwater Sewage Systems Together With Their Infrastructure, Including The Reconstruction Of The Road And The Construction Of Road Lighting, To Be Implemented In Drawsko Pomorskie, Ul. Tatrzańska – Krótka.3.1.2. The Works Covered By The Contract Should Be Designed And Performed In Accordance With The Employers Guidelines Included In The Fup And The Requirements Of Polish And Eu Law. The Contractor, On Behalf Of The Ordering Party, Will Obtain Permission To Use The Constructed Facilities.3.1.3. Scope No. 1 Includes In Particular: A) Preparation Of Design Documentation, Which Includes: Construction Designs Of Sanitary And Rainwater Sewage Networks, Construction Designs Of The Road Industry, Construction Designs Of Road Lighting, Technical Designs, Along With All Necessary Opinions, Obtaining Maps For Design Purposes, Consents, Arrangements And Permits, Including Building Permits, B) Demolition Of Existing Road Structures, Sidewalks, Entrances To The Property, C) Performance Of Construction And Assembly Works Based On The Above Designs, D) Decommissioning Of The Existing Combined Sewerage Network Along With Switching Connections To Newly Built Networks ,E) Carrying Out The Required Tests And Examinations,F) Obtaining An Occupancy Permit,G) Designers Supervision; 3.1.4. The Works Covered By The Contract Should Be Designed And Performed In Accordance With The Employers Guidelines Included In The Fup And The Requirements Of Polish And Eu Law. The Contractor, On Behalf Of The Ordering Party, Will Report The Construction Works Or, If Necessary, Obtain A Permit To Use The Completed Facilities.3.1.5. The Values Given In The Pfu Are Indicative Only. The Actual Data Will Be Determined On The Basis Of The Construction Design Prepared By The Contractor.3.2. Scope No. 2: Revitalization Of Degraded Urban Areas - Development Of The Area Between Ul. 11Th Infantry Regiment, Ul. Zamkowa, Ul. Sybiraków, Ul. Bednarska In Drawsko Pomorskie”:3.2.1. The Subject Of The Order In Scope No. 2 Is A Change In The Development Of The Municipal Area Located Between Ul. 11Th Infantry Regiment, Ul. Zamkowa, Ul. Sybiraków, Ul. Bednarska In Drawsko Pomorskie, Aimed At Organizing Parking By Designating Parking Spaces And Providing Pedestrian Communication Routes Connected To The Existing Area, As Well As Developing And Tidying Up The Area Next To The Existing Garbage Shelter, Which Are Scheduled For Demolition.3.2.2. The Scope Of The Order Includes:1. Construction And Reconstruction Of Parking Spaces And Maneuvering Areas,2. Reconstruction Of Existing Communication Routes: Pedestrian And Vehicular;3. Construction Of Retaining Walls;4. Construction And Reconstruction Of Storm Sewage Systems;5. Removing Collisions With Existing Infrastructure (Lighting, Electricity)6. Cutting Down Trees That Interfere With The Planned Development And Replacement Plantings;7. Demolition Of The Existing Garbage Shelter;8. Installation Of New Prefabricated Garbage Shelters;9. Replacement Of All Existing Lighting Poles With Foundations And Fixtures (3 Pcs.): 1) Required Parameters Of New Poles And Fixtures: A) Galvanized Park Poles, Black, 5 M High, B) Fixtures With The Following Dimensions: Parameters: • Black Led Fixture, • Total Power Not More Than 36W, • Led Luminous Flux Not Less Than 5300 Lm, • Luminous Flux Not Less Than 3650 Lm, • Luminous Efficiency Not Less Than 101 Lm/W, (Permissible Tolerance For The Required Parameters Is Up To 5%)
|