Improving The Energy Efficiency Of The Buildings Of Municipal Kindergartens No. 8 And No. 12 In Zamość, Which Includes Thermal Modernization Of The Building Of Municipal Kindergarten No. 8 At 6 Kamienna Street In Zamość And The Building Of Municipal Kindergarten No. 12 At 32 Wyszyńskiego Street In Zamość. The Investment Will Be Implemented With Co-Financing From The Government Fund Polish Government: Strategic Investment Program No. Edycja8/2023/710/Polskilad And As Part Of The Investment Task Called Improving The Energy Efficiency Of Municipal Kindergarten Buildings In Zamość. For The Building Of The Municipal Kindergarten No. 8 At 6 Kamienna Street. In Zamość, The Scope Of Works To Be Performed Under The Order Includes In Particular: 1) Construction Works, Replacement Of Window Solar Panels, B) Replacement Of Door Joinery (External), C) Implementation Of Moisture-Proof Insulation With Insulation Of Walls In The Ground; Basement Part (Including: Construction Of A Band Around The Building With Reconstruction Of The Surface, Construction Of Field Stairs), D) Implementation Of Moisture-Proof Insulation With Insulation Of Walls In The Ground; Part Without A Basement (Including: Construction Of The Surface Around The Building, Construction Of Field Stairs, Construction Of A Ramp For Disabled People), E) Insulation Of The Plinth Above The Ground, F) Insulation Of The External Walls Of The Basements Above The Ground, G) Insulation Of The External Walls Above-Ground Floors, H) Insulation Of The Ventilated Flat Roof, I) Insulation Of The Full Flat Roof, J) Insulation Of Chimneys Above The Roof, K) Renovation Of The Roof Over The Main Entrance To The Building, L) Replacement Of Balustrades At The Main Entrance To The Building.2) Execution Works In The Field Of Installation In The Field Of Electrical And Power Networks, Installations And Devicesa) Performance Of Dismantling Works Of Existing Internal Lighting, External Lighting On The Facade And Lightning Protection Installation, B) Implementation Of Internal Lighting And External Lighting On The Facade, C) Implementation Of A Photovoltaic Installation, D) Implementation Lightning Protection System, E) Installation Of Basic, Emergency And Evacuation Lighting, F) Implementation Of The Electrical Installation Of The Pumping Station. Building Of The Municipal Kindergarten No. 12 At 32 Wyszyńskiego Street In Zamość, The Scope Of Works To Be Performed Under The Order Includes In Particular: 1) Construction Works,) Insulation Of The Ventilated Attic Ceiling, B) Roof Renovation Works (Including: Chimneys, Construction Of A New Roof Covering), C) Replacement Of Window Frames, D) Replacement Of Door Frames (External), E) Insulation Of External Walls, F) Insulation Of Plinth Walls Below The Ground Along With Insulation Against Moisture, G) Insulation Plinth Walls Above The Ground, H) Replacing The Existing Building Architrave, I) Performing External Renovation Works (Including: External Renovation Works Of Stairs, Walls, Entrance Roofs, Handrails), J) Replacing The Surface Of The Earth Terrace, K) Separating A Toilet Room For Disabled People On The Ground Floor Of The Building,L) Renovation Of The Toilet Room On The First Floor Of The Building,M) Replacement Of Kitchen Goods Lifts,N) Installation Of External Roller Blinds.2) Carrying Out Installation Works In The Field Of Electrical And Power Networks, Installations And Devicesa) Assembly And Expansion Of Switchboards, B) Execution Of Electrical Installation Of Sockets And Lighting, C) Execution Of Dismantling Works, D) Construction Of A Photovoltaic Installation, E) Execution Of Ict And Monitoring Installation, F) Execution Of Installation Measurements, G) Construction Of An Intercom System, H) Execution Lightning Protection Installation.3) Carrying Out Installation Works In The Field Of Heating, Ventilation, Gas, Water And Sewage Networks, Installations And Devicesa) Carrying Out Dismantling Works; Disassembly Of Existing Radiators And The Existing Old Central Heating Installation/Ducts, B) Construction Of A New Central Heating Installation/Ducts And Fittings, C) Installation Of New Steel Plate Radiators (With Casing), Thermostatic Valve And Shut-Off Valve On The Return, D) Installation Of Vertical Control Valves And Vent Valves Of The Risers, E) Installation Of The Water Supply System, Sanitary Sewage System And Fittings In The Toilet Room For Disabled People On The Ground Floor Of The Building, F) Installation Of The Water Supply System, Sanitary Sewage System And Fittings In The Toilet Room On The First Floor Of The Building, G) Carrying Out Tests And Commissioning Of The Installation. More Information In Chapter Iii Of The Contract Specifications.
|