1. The Subject Of The Order Is The Construction Of Road Lighting In Jankowice - Ul. Ogrodowa.2. The Material Scope Of The Task Being The Subject Of The Proceedings Is Described In Detail In The Design Documentation, Technical Specification For The Execution And Acceptance Of Works, And The Bill Of Quantities. Possible Catalog Items Are Provided Only To Facilitate The Calculation - Their Use In The Valuation Is Not Obligatory. The Technical Specification, Bill Of Quantities And Design Constitute An Annex To This Specification. The Quality Requirements Of The Elements Constituting The Subject Of The Order Are Described In The Design Documentation, In Particular In The Technical Specification For The Execution And Acceptance Of The Works. 3. The Ordering Party Requires That The Subject Of The Order Be Covered By An 84-Month Warranty And Guarantee Period.4. The Contractor Will Prepare As-Built Documentation.5. The Contractor Must Indicate In Its Offer Which Elements Of The Order It Intends To Entrust To Subcontractors. 6. The Subject Of The Contract Is Defined In The Common Procurement Vocabulary With The Symbol: 45000000-7, 71320000-7, 71232310-0, 51112000-0, 45310000-3, 45316110-9, 45316110-6.7. The Contractors Obligations And Costs Also Include: A) Costs Of Laboratory Tests, B) Landfill Fees Related To The Removal Of Soil And Excess Excavated Material, C) Fees For Temporary Excavated Material Storage Sites, D) Repairs Of Roads And Streets Damaged By Means Of Transport And Construction Machines Employed On The Construction Site And Vehicles Using Detours, E) Elimination Of The Effects Of The Construction Processs Impact On The Construction Surroundings, F) Costs Of Water Discharge After Tightness Tests And Cleaning Of Silt From Ditches (Collectors) After Rinsing Pipelines And Inlets, G) Costs Of Cutting Down Trees And Shrubs, H) Compensation For The Destruction Of Crops And Greenery, I) Surveying Services Together With An As-Built Inventory And Possible Correction Of Elevations To Adapt To Existing Entrances, J) Development And Implementation Of A Road Traffic Design For The Duration Of The Works, K) Archaeological Supervision, L) Preparation Quantity Survey Book,Ł) Preparing An As-Built Surveying Inventory In 6 Copies And Submitting It To Podgik Of The Poznań District.8. The Contractor Will Use Materials With Technical, Construction And Operational Parameters Not Worse Than Those Specified In The Technical Specification And Design.9. The Ordering Party Pursuant To Art. 95 Section 1 Of The Public Procurement Law, Requires The Contractor Or Subcontractor To Employ, On The Basis Of An Employment Relationship, Persons Performing Activities Related To The Execution Of The Contract, The Performance Of Which Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 – Labor Code (Journal Of Laws Of 2022, Item 1510, As Amended). Art. 22 § 1 Of The Act Of June 26, 1974 – Labor Code: By Establishing An Employment Relationship, The Employee Undertakes To Perform Work Of A Specific Type For The Employer And Under His Direction And At The Place And Time Designated By The Employer, And The Employer - To Employ The Employee For Remuneration.9.1. Type Of Activities Related To The Implementation Of The Contract To Which The Requirements Apply To The Employment On The Basis Of An Employment Relationship By The Contractor Or Subcontractor Of Persons Performing Activities During The Implementation Of The Contract: Activities Of Construction Workers Described In The Bill Of Quantities. The Ordering Party Requires That Persons Implementing The Subject Of The Contract Who Will Perform Activities Actually Related To With The Subject Of The Order Described In The Specification Of Terms Of The Order Were Employed On The Basis Of An Employment Contract. In The Event Of Termination Of The Employment Relationship Before The End Of The Order, The Employee Undertakes To Immediately Employ Another Person In His Place, If Necessary To Maintain Continuity Of Work.9.2. Method Of Verifying The Employment Of These People: The Contractor Will Be Obliged To Provide The Ordering Party With Documents Confirming The Manner Of Employment Of The Above-Mentioned Persons Within 5 Working Days From The Date Of Conclusion Of The Contract. Persons (List Of Employees): Declaration Of The Contractor Or Subcontractor On The Employment Of An Employee Under An Employment Contract Containing: Name And Surname Of The Employed Employee, Date Of Conclusion Of The Employment Contract, Type Of Employment Contract And Scope Of The Employees Duties, Under Penalty Of Contractual Penalties For Providing False Data Or Failure To Update The List Of Employees In The Event Of Personnel Changes. 9.3. The Ordering Partys Rights To Control The Contractors Compliance With The Requirements Related To The Employment Of These Persons And Sanctions For Failure To Meet These Requirements: A) Method Of Documenting The Employment Of The Above-Mentioned Persons. Persons: A1) Construction Works Will Be Performed In Particular By Persons Listed In The List Of Employees Performing Activities During The Execution Of The Order, A2) The Contractor, At Each Written Request Of The Ordering Party, Will Submit To The Ordering Party A Report On The Status And Manner Of Employment Of The Above-Mentioned Employees Within 5 Working Days. Persons, Submitted Proof Of Payment Of Zus Contributions Throughout The Entire Order Execution Period Or A Copy Of The Proof Confirming The Employers Registration Of The Employee For Insurance, Anonymized In A Way That Ensures The Protection Of Employees Personal Data, In Accordance With The Provisions Of The Act Of May 10, 2018. On The Protection Of Personal Data, A Certified Copy Of The Employment Contract Of The Employed Employee. B) Sanctions For Failure To Meet Employment Requirements: B1) In The Event Of Failure To Submit The Information Referred To In Point. 9.2. And 9.3. Swz Or Providing False Data Or Failure To Update The List Of Employees (Within 5 Business Days From The Date Of The Change) In The Event Of Personal Changes, The Contractor Will Each Time Pay The Ordering Party A Penalty Of Pln 2,000.B2) In The Event Of Failure To Fulfill The Obligation Indicated Twice In Point 9.2. And 9.3. Or Changes In The Method Of Employment Of The Indicated Persons, The Ordering Party Has The Right To Withdraw From The Contract And Charge The Contractual Penalty Referred To In §8 Section 1 Letter D Of The Draft Contract. B3) In The Event Of Failure To Employ, During The Execution Of The Order, Persons Under An Employment Contract Required By The Ordering Party, The Contractor Will Be Obliged To Pay A Contractual Penalty To The Ordering Party In The Amount Of 0.01% Of The Remuneration Referred To In § 5 Section 1 Of The Contract, For The Stage Of Work In Which The Employment Requirement Was Not Met, B4) In Justified Cases, For Reasons Not Attributable To The Contractor, It Is Possible To Replace The Above-Mentioned Person Or Other Persons, Provided That All The Above Requirements Regarding The Method Of Employment For The Period Of Contract Implementation Specified By The Contractor In The Offer Are Met. B5) In The Event Of Justified Doubts As To Compliance With Labor Law By The Contractor Or Subcontractor, The Ordering Party May Request Inspection By The National Labor Inspectorate.
|