Tenders are invited for Elimination Of Deficiencies In The Protective Structure Of Civil Protection At Pdu Nové Zámky Kukučínova 1, 940 02 Nové Zámky Elimination Of Deficiencies In The Civil Defense Protective Structure At Pdu Nové Zámky Kukučínova 1, 940 02 Nové Zámky 1. Elimination Of Deficiencies From The Report From The External Expert Inspection Of Tns And The State Of Water And Sludge Management 12/2019/Du –Nz A. 1 Steel Container - Corroded, Leaky, There Is No Technical Sheet And Declaration Of Conformity - A Complete Overhaul Is Required B. Safety Equipment And Fittings On The Tank: They Are Corroded, Incomplete And Non-Functional, Outdated After Their Useful Life - A Total Overhaul Is Required C. The Sewage System Is Not In A Satisfactory Condition, The Device For The Purpose Of Pumping Sludge Is Not Functional, The Closing Fittings (Valves) Are Corroded, Non-Functional, The Balls And Drains From Individual Appliances Are Non-Functional, Outdated After Their Useful Life D. Water Distribution And Main Water Supply - Galvanized Pipes Are Corroded, Clogged, Including Connecting Fittings, They Are Too Old After Their Useful Life - A Total Overhaul Is Required E. Furnishings (Toilets 3 Pcs. And Sinks 1 Pc. (Too Old And Beyond The Useful Life - Replacement Is Necessary, The Internal Float Mechanism, Shut-Off Valves, Water Faucet Must Be Replaced F. The Functional And Operating Diagram And Operating Regulations For The Operation And Maintenance Of The Water System Have Not Been Processed And Sludge Management G. The Electric Compressor For Pressurizing The Water Tank Is Out Of Order, After Its Useful Life - The Lila-75 Manual Sludge Pump Does Not Work Properly - A Complete Overhaul Is Required Non-Functioning, Including The Electric Motor. The Float Mechanism For Starting The Sludge Pump Is In Need Of A Complete Overhaul, Including The Suction Basket And Declaration Of Conformity To New Products 1. External Expert Inspection Of Tns And Water And Sludge Management And Preparation Of Revision Report 2. Elimination Of Deficiencies From Revision Of Fvz - Final Protocol No. 2019/Dunz: A. State Of Suction Sides: S1 Is Not Operable, Nh1 – Not Operable, Ends In Anti-Gas Antechamber, Needs To Be Completed, Measured Resistance 30 Pa B. It Is Necessary To Extend The Pipe Of The Suction Side Up To The Basement Corridor And Provide It With A Suction Head C. Nh - It Is Not Functionally Suitable, The Correct Type Of Head Is Not Installed, The Measured Resistance Is 40 Pa D. It Is Necessary To Document The Suction Sides S1 And S2 E. Hpf Needs To Be Replaced, It Is Clogged, Has High Resistance F. Seal The Transitions Of The Installations, Reconstruct The Pp And Its Lining With The Door Frame, Hollow Wall From Moisture, Corroded Closing Levers, Secured Springs, Clean The Hatch And Project The Position Of G. The Positions "O", "Z" Are Not Clearly Marked On The Doors And Hatches H. Make Minor Repairs To The Walls And Repair Paintings (10M2) I. Process The Functional And Operating Diagram And Operating Regulations Of The Fvz J.Carrying Out A Professional Inspection Of The Fvz And Drawing Up A Review Report For Add Accessories And Spare Parts: - Oil Can Including Oil For Devices - 1 Pc - Round Wire Dn 4 Mm - 5 Mm - Enameled Wire Dn 0.5 Mm - 2 Mm - Pin No. 400804 – 2 Pcs. 3. Provide Co Training In Accordance With § 6 Par. 1. Letter C) Decree Of The Ministry Of The Interior Of The Slovak Republic No. 303/1996 Coll., As Amended, For 2 Persons 4. Construction Of Emergency Lighting In The Number Of 6 Emergency Lamps And Preparation Of An Emergency Lighting Revision Report 5. Transport 6. Disposal Of Waste
|