Construction Work – Energy Efficiency Improvement.-Se Pathology. Monumental/Local Protection: Locally Protected (Municipal Decree 35/2017 (Xii.22.)) Useful Floor Area (Which Is The Same As The Heated Floor Area) In Total: 4,904.73 M2 Budapest Ix., Owned By Semmelweis University. District, Geographical Number 37192, Energy Modernization Of The Building Of The Institute Of Pathology, Forensic And Insurance Medicine Located On Property 1091 Budapest, Üllői Út 93 Within The Framework Of The Kehop Tender. The Construction Must Be Carried Out In An Operating Institution, Therefore The Bidder Must Make His Offer In Such A Way That He Must Have The Necessary Capacity To Complete The Construction Works Within The Deadline. The Technical Content Of The Renovation: - Thermal Insulation Of The Attic Floor /651.5 M2/ - Wooden Floor After The Preparation Of A Peer And Static Expert Opinion - Renovation/Replacement Of Facade Doors And Windows (Renovation Of Doors And Windows With Connected Shutters, Installation Of New Wooden Thermal Insulation Glazing Doors And Windows, Shading According To The Technical Description And Consignment/ - Retrospective Creation Of Wall Insulation /Injection 199 M2, Insulation 603 M2/ - Installation Of A Solar Panel System /36.9Kwp/ - Mechanical Modernization - With The Modernization Of The Heating System - Construction Of The Building Automation System Details Of The Work To Be Carried Out: - Thermal Insulation Of The Attic Floor: The Attic Floor Will Be Impregnated With 20 Cm Rockwool Thermal Insulation , Laid Between A Flame- And Fungus-Free Wooden Support Frame, With A Layer Of At Least A2 Fire-Resistant Chipboard. 1. A New Window With A Wooden Structure And Heat-Insulating Glazing (Windows Marked Kp01). We Will Replace Most Of The Facade Windows With New, Modern Wooden Structures. The Dividers On The Wings Are Designed As False Dividers. After Opening The Existing Door And Window, According To The On-Site Measurements, If Necessary, The Case Must Be Supplemented With A Case Opener. 3-Layer Heat-Insulating Glazing Is Placed In The Wings. According To The Customers Decision, Before The Start Of Construction And Production, It Is Necessary To Agree On The Design Of The Windows That Require The Provision Of Privacy. 2. Renovation Of A Wooden-Framed Hinged Casement Window - By Removing And Replacing The Inner Sash (Windows And Doors Marked Kp02). On The Mezzanine Level, On The Right-Hand Side Of The Facade On Üllői Street, The Existing Connected Casement Windows Will Be Renovated. The Inner Wings Are Removed And Replaced By New Wings. In All Cases, During The Renovation, It Is Necessary To Comply With What Is Written In The Expert Opinion Of The Wood Restorer. 3. Wooden Structure Door (Doors And Windows Marked Kp03). The Structure Of The Main Entrance Portal From Üllői Út Is Adequate, It Requires A Complete Wood Protection And Aesthetic Renovation According To The Expert Opinion Of The Wood Restorer 4. Shading: In The Case Of The Windows And Doors On The Facade On The 2Nd Floor, The Existing Superstructure
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79340580
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.