Presqu’Ile Bay Fixed Aid Modifications . The Canadian Coast Guard Has A Requirement To Modify The Pair Of Existing Range Towers Used Within Presqu’Ile Bay To Guide Commercial And Recreational Vessels From Lake Ontario Into The Bay. The Intent Of The Project Is To Perform A Geotechnical Investigation At The Front Range Tower, Ll487 Brighton Range Front, In Preparation For A New Tower, Engineered Foundation, And Sector Light That Will Be Installed In The Same Location. The Contractor Is Responsible For Performing A Geotechnical Investigation And Obtaining An Engineered Foundation Designed To Meet The Intended Loads Of The Tower And The Results Of The Geotechnical Investigation. In Preparation For The New Tower, The Front Range Tower Will Be Demolished By The Contractor. The New Tower Has Been Fabricated By Others In Anticipation Of Construction And Will Be Provided To The Contractor At The Ccg Dsl. Following The New Foundation Construction And Tower Installation By The Contractor, And Confirmation Of Sector Light Installation By Ccg, The Rear Range Tower, Ll488 Brighton Range Rear, Will Be Demolished In Its Entirety. Both Towers Marked For Demolition Contain Lead-Based Paint And Are Located In Public Areas. All Enquiries Must Be Submitted In Writing To The Contracting Authority No Later Than Seven (7) Calendar Days Before The Bid Closing Date. Enquiries Received After That Time May Not Be Answered. Closing Date Of The Bid May 2, 2024 At 14:00 Et
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79308866
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.