1. The Subject Of The Order Is The Reconstruction And Thermal Modernization Of The Buildings Of The School And Kindergarten Complex In Otmice Ul. Klonowa 28, 47-180 Izbicko And Includes:A. Development Of Design Documentation To The Extent Necessary To Perform The Task, Together With The Technical Specification For The Execution And Acceptance Of Works And Investor Cost Estimates, Guaranteeing The Achievement Of The Parameters Specified In This Functional And Utility Program, In Particular: - Supplementing Or Detailing The Inventory, Preparing Expert Opinions, Opinions, Measurements And Necessary Tests To Carry Out The Project And Implement The Task; Developing A Concept Of Design Solutions (Including A Schedule) For The Facility Of The School And Kindergarten Complex; Preparing A Construction Design Together With Obtaining The Necessary Arrangements And A Decision On A Building Permit Or Reporting The Execution Of Construction Works To The Extent Necessary To Implement The Project Including, Among Others, Construction Of A Gas Boiler Room, Reconstruction Of The Ventilation System, Installation Of Gas Installations Inside And Outside And Other Works Resulting From The Adopted Scope; - Depending On The Obligations Arising From Legal Provisions - Preparation Of Executive Or Technical Designs Divided Into Industries; - Preparation Of Technical Specifications For The Execution And Acceptance Of Works And The Investors Cost Estimate;B. Performance Of Construction Works Based On A Building Permit Or Notification Of Construction Works, Design Documentation, Technical Specifications For The Execution And Acceptance Of Works And Investor Cost Estimates Along With Obtaining An Occupancy Permit, If Such An Obligation Results From The Decision On The Building Permit Or Applicable Legal Provisions The Implementation Of The Project Aims, Among Others, To: Improving The Energy Efficiency Of The Facility, Improving The Technical Condition Of Its Components And Improving The Functionality Of The Rooms.1) Characteristic Parameters Determining The Size Of The Facility Or The Scope Of Construction Worksno. Parameters Defining The Size Of The Object Unit Quantity1. Usable Area M2 1,709.602. Cubature M3 5,507.193. Number Of Floors - 44. Share Of Traffic Area In The Net Area % 25.5 The Scope Of Work To Be Carried Out As Part Of The Implementation Of This Project Includes: A) Insulation Of Ceilings/Flat Roofs Of The Buildings Of The School And Kindergarten Complex; B) Insulation Of External Walls Of The Buildings Of The School And Kindergarten Complex, Including The Works Accompanying;C) Replacement Of External Doors In The Buildings Of The School-Kindergarten Complex;D) Replacement Of Windows In The Buildings Of The School-Kindergarten Complex;E) Comprehensive Reconstruction Of The Central Heating Installation;F) Construction Of A Complete Gas Boiler Room In The Existing Boiler Room In The Basement Or Other Location With The Consent Of The Ordering Party;G) Comprehensive Reconstruction Of The Electrical Installation In The Building, Including The Replacement Of Light Sources With Energy-Saving Ones And Taking Into Account The Modernization Of Other Installations And The Concept Of Renovation Of The Kitchen Facilities;H) Modernization Of The Ventilation System In Both School Buildings, Including The Installation Of Mechanical Ventilation With Heat Recovery In The Gymnasium And In The Kitchen Facilities;I) Implementation Of An Energy Management System For Heating Purposes (Boiler Room + Ventilation With Heat Recovery),J) Implementation Of External And Internal Gas Installations To Power The Boiler Room And Catering Equipment;K) Performance Of Protective Works Before And Finishing Works After Replacing Sanitary Installations, Ventilation And Modernization Of The Electrical Installation;L) Comprehensive Reconstruction Of The Floor In The Gymnasium With The Use Of A Sports Carpet;M) Comprehensive Replacement Of The Roof Covering Along With The Renovation Of Chimneys;N) Construction Works Related To The Modernization Of The Kitchen And Its Facilities Along With The Delivery And Installation Of Devices According To The Concept By Graf S.C. And Renovation Of The Canteen, O) Painting The Surfaces Of Walls And Ceilings In The Rooms Of The School And Kindergarten Complex; P) Works Related To Landscaping. A Simplified, Indicative Bill Of Quantities For The Buildings Of The School And Kindergarten Complex: (The Bill Of Quantities Results From The Energy Audit, Building Inventory And Renovation Concept Kitchen Facilities And Other Requirements Specified In This Ffu) No. Parameters Defining The Scope Of Construction Works Units Quantity1. Insulation Of The Flat Roofs Of The Main Building And The Gymnasium M2 7302. Insulation Of The Flat Roof Above The Entrance To The Main Building M2 123. Replacement Of External Doors M2 11.54. Replacement Of Windows M2 340.35. Insulation Of External Walls Above Ground M2 10506. Insulation Of Basement Walls And Other Walls Below The Ground M2 3707. Replacement Of The Ceiling In The Gymnasium Set 18. Reconstruction Of The Boiler Room Of The Central Heating System. With Power Source Set 19. Modernization Of Ventilation Set 110. Reconstruction Of The Electrical Installation, Including Replacement Of Lighting With Energy-Saving Ones And Construction Of Low-Current, Lan, Cctv Installations Set 111. Hydrant Installation Set 112. Other Sanitary Installations (Hot Water, Water And Sewage) Set 113 . Modernization Of The Kitchen Facilities And Accompanying Works Set 114. Energy Management System Set 115. Land Development (Gravel Strip With Installation Of Light Wells, Renovation Of The Pedestrian And Driveways And Entrances To The Buildings) Set 116. Renovation Of The Roof Set 117. Reconstruction Of The Floor In The Gymnasium Set 118. Renovation Of The Canteen Room, Set 119. Painting Of Walls And Ceilings Along With Accompanying Works M2 450020. Construction Of A Gas Connection To The Building Along With Internal Installation Set 1 The Detailed Scope Of Implementation Of The Subject Of The Order Is Determined By: • Functional And Utility Program - Constituting Annex No. 9 To The Swz
|