The Scope Of The Order Includes Supervision Of Construction Works Consisting In The Construction Of Municipal Roads And Agricultural Transport, Together With The Construction And Reconstruction Of Culverts, Desilting And Clearing Drainage Ditches (Drainage Devices). The Task Is Related To The Implementation Of Post-Consolidation Land Development As Part Of The Consolidation Of Land In The Kolonia Krzywowierzba District, Commune. Dębowa Kłoda, Parczew County, Lublin Voivodeship. The Detailed Scope Of Work Subject To Supervision Is Included In Annex No. 1 To Swz. The Scope Of Supervision Will Include: A) Supervising The Design, Verification Of The Design Documentation, Its Completeness, Mutual Compliance, Verification Of The Results Of Control Calculations In Order To Find Possible Errors, B) Arriving At Every Justified Request Of The Ordering Party Or The Contractor Of The Works Subject To Supervision And Visiting The Construction Site During The Physical Implementation Of Construction Works At Least Once A Week, C) Representing The Ordering Party On The Construction Site By Checking The Compliance Of Its Implementation With The Project, Regulations And Applicable Standards And Principles Of Technical Knowledge, As Well As Checking The Quality Of Completed Works And Built-In Products, And In Particular Preventing The Use Of Defective Products And Products Not Approved For Trading And Use In Construction, D) Checking And Acceptance Of Works That Are Covered Or Disappearing And Participation In The Acceptance Activities Of Finished Objects Construction Works And Handing Them Over For Use, E) Confirmation Of Actually Performed Works And Removal Of Defects, As Well As Controlling Construction Settlements, F) Issuing Orders To The Construction Manager, Confirmed By An Entry In The Construction Log, Regarding: Removal Of Irregularities Or Threats As Well As Works Or Hidden Elements Requiring Discovery And Presenting Expert Opinions On The Ongoing Construction Works And Evidence Of Approval For The Use Of Construction Products In Construction, G) Suspending Construction Works If They Are Carried Out Contrary To The Contract And Occupational Health And Safety Regulations And Immediately Notifying The Ordering Party Of This Fact, H) Approving Materials Consistent With The Requirements Of Stwior From The Indicated Sources By The Contractor Of Construction Works, I) Making Decisions On The Approval Of The Use Of Materials With The Manufacturers Certificate, J) Controlling The Method Of Storing And Storing Materials And Tidying Up Storage Places After The Completion Of The Works, K) Participating In Measurements, Tests And Sampling Confirmed In The Sampling Protocols Or Research; Assessing The Results Of Tests And Measurements And Providing Written Confirmation Of Compliance With Stwior By The Supervision Inspector Competent For A Given Industry, L) Requesting The Construction Manager To Make Corrections Or Re-Performing Defectively Performed Works, As Well As Suspending Further Construction Works If Their Continuation Could Cause A Threat Or Cause Unacceptable Non-Compliance With The Design Or Construction Permit, M) Verification Of The Contractors Cost Estimate Settlements In Terms Of Valuation Principles And Methods, N) Control Of Measurements And Their Confirmation, O) Ensuring That The Construction Site Is Secured By The Contractor Of Construction Works In The Event Of Withdrawal From The Contract For Construction Works, P) Immediately Informing The Ordering Party About Any Claims Of The Construction Contractor, Events On The Construction Site Regarding, E.G. Health And Safety, Q) Making Entries In The Construction Log, R) Participating In The Work Of The Final Acceptance Committee, Inspections Carried Out By Construction Supervision And Other Bodies Authorized To Inspection And Ensuring The Implementation Of The Findings And Decisions Made During The Inspection, S) Organizing Technical/Construction Councils, At Least Once A Month (In Which The Works Are Carried Out), T) Monitoring The Timeliness Of The Works, Informing The Ordering Party About The Progress Of Construction Works And Immediately Informing The Ordering Party About Any Circumstances That May Affect The Extension Of The Investment Implementation Deadline, Changes Or The Need To Perform Works That May Have Economic Consequences For The Ordering Party, U) If Necessary, At The Request Of The Ordering Party, Preparing Photographic Documentation (In Digital Technology) Of The Progress Of Work, V ) Giving Opinions On The Need To Perform Works And Possible Alternative, Additional Or Complementary Solutions, W) Preparing, In Consultation With The Ordering Party, Reports On The Need To Perform Additional, Supplementary Or Replacement Works And, If Necessary, Developing The Necessary Executive Documentation, X) Participating In Committees, Meetings And Conferences In During The Implementation Of The Works And During The Warranty And Guarantee Period, Y) Coordination Of Contacts Between The Ordering Party And The Contractor Of Construction Works, Z) Carrying Out Current Inventories, Aa) Confirming The Date Of Completion Of The Works, Bb) Monitoring The Execution And Checking The As-Built Documentation.
|