Dredging And Pumping Works – Dredging Regular 2021B - Subarea 4 (Dig-14910/04). The Assignment Concerns The Dredging Of Waterways In Both Urban And Rural Areas, Spread Over Various Polders, Within The Hhr Management Area. Activities Mainly Consist Of: • Carrying Out Preparatory Work; • Setting Up (Transshipment) Locations; • Carrying Out Dredging Work; • Transporting And Processing Dredged Material; • Cleaning Culverts And Under Bridges; • Separating And Transporting (Bulky) Waste; • Drawing Up And Concluding Contracts For The Receipt Of Dredged Material; • Paying Cooperation Allowances; • Carrying Out Additional Work Of A General Nature. The Entire Work Must Be Completed No Later Than July 18, 2025, And 50% Of All Cubic Meters To Be Dredged Must Be Dredged By January 31, 2025. Hhr Wants The Work To Be Achieved Sustainably Through The Use Of Hvo100. 100% Of Mobile Equipment And Vessels Demonstrably Run On Hvo100 During Implementation. This Will Be A Minimum Requirement During The Execution Of The Assignment. The Emission Performance Of The Equipment Used Is Periodically Checked By Random Samples By The Client. If It Is Found That The Tenderer Does Not Comply With The Application Of Hvo100, A Fine Of € 2,500 Per Observation (Per Equipment) Will Be Immediately Imposed. The Client Reserves The Right To Inspect Any Equipment Deployed. Before Registration, The Tenderer Is Deemed To Have Informed Himself Of The Location Of The Work Sites, Unloading And Loading Options, Accessibility, Existing Situation And All Other Necessary Information That May Be Important For A Good Registration, In Preparation For The Implementation Of Work.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79282695
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.