1. The Subject Of The Order Is The Construction Of An Internal Gas Installation In A Multi-Family Building At Ul. Jagiełka 2, Including Installation Of Boilers With Chimneys.2. The Planned Scope Of Works Includes: 1) Construction Of A Low-Pressure Gas Installation Made Of Black Steel Pipes With A Seam From The Designed Gas Tap On The Building Wall To The Gas Meters Located In The Corridor, And Then To The Gas Receivers Located In The Premises. A Gas Installation For Existing Gas Stoves And Designed Single-Function Gas Boilers With A Closed Combustion Chamber With A Power Of Up To 17 Kw Has Been Designed In Apartments: 1, 3, 4, 5, 6, 7, 8, 9, While In Apartment No. 2 A Kitchen Installation Will Be Installed. Gas – No Central Heating Installation. Existing Solid Fuel Boilers Should Be Dismantled Along With Part Of The Hot Water Tank Installation. The Tanks Must Be Connected To The New Hydraulic System. The Designed Gas Fuel Boilers Will Be Installed In Existing Residential Premises In A Room Not Intended For Permanent Human Stay - The Kitchen. The Air-Flue Gas Duct Should Be Led Above The Roof In Accordance With The Boiler Operating Instructions. The Rooms Will Be Ventilated Through The Existing Ventilation System. After Cleaning The Existing Flue Gas Ducts From Soot, Install An Inspection Door In The Place Where The Existing Flues From Solid-Fuel Boilers Are Connected. Notes: - The Connection Of The Internal And External Gas Installation Of The Building With The Connection Should Be Made By The Gas Supplier Or The Contractor In His Presence. - The Delivery Of The Gas Meter, Including Its Installation, Is The Responsibility Of The Gas Supplier. - The Gas Apparatus Must Be Permanently Connected To The Pipes (Connections) Using A Two-Piece Connector. - Inspection And Tightness Test Of The Gas Installation Should Be Carried Out In The Presence Of A Representative Of The Gas Supplier, And A Report Should Be Prepared. - Before Putting The Gas Installation Into Operation, A Positive Opinion Regarding The Patency Of The Ventilation And Exhaust Duct Must Be Obtained From The Chimney Sweep Cooperative.3. A Detailed Description Of The Order Is Included In: Technical Documentation, Detailed Technical Specification For The Execution And Acceptance Of Works, Conditions Of Connection To The Gas Network, Bill Of Quantities Constituting The Information Basis And The Draft Contract.4. If The Manufacturers Name, Trademarks, Standards, Approvals, Technical Specifications And Reference Systems Appear In The Swz Or Any Annex To The Swz, The Products May Be Replaced By Equivalent Ones. The Ordering Party Will Consider Equivalent Solutions To Be Solutions That Make It Possible To Achieve The Effect Intended By The Ordering Party Using Other Technical Solutions. An Identical (Identical) Solution Cannot Be Considered An Equivalent Solution, But Only One That Shows Exactly The Same Or Very Similar Utility Value In The Compared Features. By Indicating The Manufacturers Name, Trademarks, Standards, Approvals Or Reference Systems, The Ordering Party Aimed To Determine The Minimum Quality Parameters And Functional Features That The Goods Must Meet In Order To Meet The Requirements Set By The Ordering Party And Constitute Only The Quality Standard Of The Subject Of The Order. By The Provision Regarding The Minimum Requirements For Quality Parameters, The Ordering Party Understands The Requirements Of The Goods Contained In Publicly Available Sources, Catalogues, Manufacturers Websites, Etc. The Use Of Exemplary Manufacturers Names Is Only Intended To Clarify The Level Of The Ordering Partys Expectations In Relation To A Specific Solution.5. The Contractors Obligations Related To The Performance Of The Subject Of The Order Are Specified In The Draft Contract. Careful Reading Of The Draft Contract Is Necessary For Proper Preparation Of The Offer.6. The Contractor Is Obliged To Prepare An As-Built Geodetic Inventory And Register It In The District Geodetic Documentation Center At His Own Expense. Note: Together With The Offer, The Contractor Is Obliged To Submit An Offer Cost Estimate.
|