The Subject Of The Order Is: Renovation Of The Rooms Of The Threat Prevention Department Of The Provincial Headquarters Of The State Fire Service In Krakow. The Renovation Will Cover Part Of The Building Within The Set Of Indicated Rooms Of The Threat Prevention Department. The Complex Is Located In The Left Wing Of The Building (South) - On The Ground Floor, Looking From The Main Entrance. The Construction Works Are Aimed At Improving The Living Conditions And General Aesthetics Of The Rooms, Improving The Working Conditions Of The Commands Employees And Adapting The Threat Prevention Department To The Ongoing Changes Related To The Digitization Of Document Circulation. The Properties In Terms Of Resistance, Insulation And Fire Tightness Of The Ceilings (Rei) Will Not Be Changed. As Well As Structural Walls Separating The Rooms Subject To Reconstruction. After Dismantling The Doors, The Vestibule Rooms Will Be Incorporated Into The Corridor - Communication Route. The Renovation Will Not Change The Conditions For Evacuation From These Rooms To The Safe Zone. There Are No Hazardous Or Easily Flammable Materials In The Rooms, In Accordance With Fire Protection Requirements. The Basic Scope Of Works Includes: Disassembly: - Dismantling Of Lighting Fixtures, - Dismantling Of Accessories (Sockets, Switches, Etc.). - Dismantling Of The Structured Cabling Installation, - Dismantling Of Internal Doors. .Demolition Works: - Cutting Off The Top Layer Of The Floor (Stoneware/Ceramic Tiles And Adhesive Mortar/Floor Panels), - Demolition Of Partition Walls, - Cutting Off Wall Tiles (Facing In One Room). Renovation Works (Including Assembly): - Making New Ones Floors Made Of Stoneware/Vinyl Panels, - Plastering Of Walls (Additions), Wiping Of Plasters, Construction Of Suspended (Panel) Ceilings, - Cladding Of Walls With Ceramic Tiles (Strip Above The Kitchenette), - Erection Of New Partition Walls, - Installation Of New Doors, Point Bricking Up Door Openings, - Installation Of Ventilation Grilles, Air Conditioner - Electrical Works In The Field Of Cabling And Installation Of Elements Of Plug Sockets, Connectors, - Implementation Of A New Installation Of Structured Cabling, Lan Sockets, Etc., - Water And Sewage Installation Works. – Connection Of The Kitchenette (Connection Of Utensils, Replacement Of Pipework, Installation Of New Fittings, Replacement Of Sections Of Sewage And Water Supply Installations), - Connection Of Panel Radiators (Reassembly), - Installation Of Permanent Equipment, - Other Finishing Works. Before Starting The Works, All Necessary Safeguards Must Be Carried Out , Gather The Necessary Tools And Equipment. The Ordering Party Informs That The Construction Works Will Be Performed In An Active Facility, Therefore, The Contractor Is Obliged To Carry Out The Works In A Way That Allows Normal Use Of The Rest Of The Rooms In The Building. All Materials And Devices Used To Perform The Works Should Meet The Requirements Of Relevant Standards And Have Approvals. Technical Approvals, Certificates, Certificates Of Approval For Use, Declaration Of Conformity Required Or Voluntarily Used By Manufacturers. All Works Must Be Carried Out In Accordance With Construction Practice, Polish Standards And Occupational Health And Safety And Fire Protection Regulations. The Detailed Scope Of Work Is Presented In: - Description Of The Subject Of The Order - Floor Plan Of The Rooms (Existing And Target Condition) - List Of Doors. The Documents Constitute Attachments To This Swz. The Ordering Party Emphasizes That The Attached Bills Of Quantities Are For Auxiliary And Indicative Purposes Only, And The Documents Attached To The Swz Are The Basis For Calculating The Offer Price.
|