1. A Detailed Description Of The Subject Of The Order Was Specified In The Design Documentation, Entitled: Modernization Of The Central Heating Boiler Room Together With The Renovation Of The Basement Room In The Building Of The City And Commune Office Of Siewierz, Technical Specification For The Execution And Acceptance Of Construction Works, Drawings And Specification Of The Terms Of Order (Swz).2. The Subject Of The Order Includes In Particular: A) Modernization Of The Boiler Room; - Draining Water From The Entire Heating Installation In The Building, - Replacing The Existing Gas Boiler With A New Cascade Of Two Condensing Boilers With A Total Power Of 145Kw, - Dismantling The Existing Gas Boiler, Existing Pipelines, Pumps, Flue, Chimney Flues, Fittings And Elements And Installations That Will Not Be Used In The Operation Of The New Boiler Room, - Dismantling The Inactive Solid Fuel Boiler, Existing Pipelines, Pumps, Flue, Chimney Flues, Fittings And Elements And Installations That Will Not Be Used In The Operation Of The New Boiler Room ,- Adaptation Of Existing Installations (Water Supply, Central Heating, Sewage, Electricity, Gas, Ventilation) To Work With The New Gas Boiler System), - Disassembly Of Boiler Piping And Fittings, Dismantling Of The Lagging From The Dismantled Pipelines; - Construction Of An Internal Gas Installation, Including: Designation And Construction Of The Internal Route Of The Gas Installation, Laying Cables In The Buildings Boiler Room, Connecting Gas Receivers, Connecting The Gas Installation To The Gas Source, - Installation Of Devices In The Boiler Room (According To The Design), Including: A Cascade Of Two Condensing Gas Boilers, With A Total Power Of 145 Kw, Control Automation ,- Setting The Boiler Temperature Control (Automatic), Enabling The Setting Of A Constant Temperature In Rooms And Reducing The Temperature On Non-Working Days And After Office Hours, - Laying Pipelines In The Boiler Room, - Equipping The Boiler Room With A Gas Detection System, - Adapting The Existing Heating Installation To New Heating System, - Performing Tightness Tests, - Performing A Pressure Test, - Filling The Water Installation, - Starting The Heating System, B) Renovation Of The Existing Boiler Room Rooms: - Cutting The Concrete Foundation Under The Inactive Boiler And Circulation Pumps (According To The Design), - Building Walls And Floors With Ceramic (Stoneware) Tiles, - Repainting, - Painting Of Rooms, - Removal Of Existing Washbasin And Fittings, - Replacement Of Ei 30 Fire Protection Doors, C) Execution Of Electrical Installation, Including: - Installation Of A New Rko 400 Switchboard /230V, - Installation Of Lighting In The Boiler Room, - Installation Of Plug Sockets, - Installation Of Power Supply For The Boiler Room Equipment. All Works Should Be Carried Out During The Working Hours Of The Siewierz City And Commune Office, Taking Into Account The Presence Of Employees And Visitors.3. The Contractor Will Also Be Obliged To: 1) Arrange And Mark The Construction Site, Secure It Appropriately And Provide Appropriate Health And Safety Protection. 2) Carry Out Security And Reconstruction Works In Accordance With The Design And The Correct Technology Of Work Execution. 3) Carry Out All Accompanying Works In Accordance With The Design And Correct Technology For Performing The Works.4) Making Possible Water And Energy Connections For Construction Purposes And Incurring The Costs Of Media Consumption.5) Incurring Any Costs Of Turning On And Off The Utilities.6) Preparing A Design For The Organization And Technology Of Works And Applying It In Practice, Taking Into Account Health And Safety Conditions . 7) Execution Of The Subject Of The Contract In Accordance With The Arrangements With The Network And Site Infrastructure Managers, If Necessary, 8) Ensuring Supervision Of The Relevant Network And Site Infrastructure Managers If The Works Require Supervision Or If It Results From Other Arrangements, Also In The Event That Paid - The Contractor Will Bear These Costs.9) Carrying Out The Necessary Tests, Tests And Measurements As Well As All Tests, Tests And Measurements At Each Order Of The Ordering Party In Order To Determine The Correctness Of The Works Performed.10) In The Event Of Destruction Or Damage To Devices And Existing Networks During The Execution Of The Task - Repair Them And Restore Them To Their Original Condition. 11) Notifying The Employer Of Works That Are Covered Or Disappearing.12) If The Works That Are Covered Or Disappearing Are Not Reported For Acceptance, The Contractor, At The Request Of The Employer, Is Obliged To Carry Out Examinations, Tests And Commissioning, As Well As To Make Discoveries.13) Ensure Authorized Supervision And Supervision, As Well As Appropriate Occupational Health And Safety Conditions.14) Regularly Removing Unnecessary Materials, Waste And Garbage From The Construction Site.15) Tidying Up The Construction Site After The Works Are Completed And Handing It Over To The Employer No Later Than The Date Of Final Acceptance.16) Restoring The Area After The Works Performed At Least To Its Original State (Unless Specific Arrangements Provide For A Different Scope Of Restoration), 17) Taking All Precautions Necessary To Preserve Materials And Parts Obtained From Demolition Indicated By The Ordering Party. The Materials Indicated By The Ordering Party That Are Suitable For Reuse Or Installation Are The Property Of The Ordering Party. The Remaining Materials Will Be Disposed Of By The Contractor. Regardless Of The Purpose For Which The Ordering Party Intends To Use The Said Materials And Parts To Which He Reserves The Ownership Rights, All Costs Incurred For Transport And Storage In The Place Indicated By The Ordering Party Will Be Covered By The Contractor For Transport Over A Distance Of Up To 10 Km; Scrap Obtained From Demolition Constitutes The Ordering Partys Income.18) Making Arrangements, Including Registering The Boiler Room Equipment With The Office Of Technical Inspection, Including The Costs Of Their Registration And Obtaining All Opinions Necessary To Perform The Subject Of The Contract And Put It Into Use.19) Ensure Specialized Protection Of The Facility, If The Works Cause It To Open In Any Way.20) Carry Out Other Works Necessary For The Correct And Comprehensive Implementation Of The Subject Of The Order.4. The Remaining Terms Of The Order Are Specified In Chapter Iii, Point 5 Of Swz.5. The Criteria Used To Assess Equivalence Are Specified In Chapter Iii, Point 6 Of Swz.6. The Obligation Of The Contractor Or Subcontractor To Employ Persons On The Basis Of An Employment Relationship Is Specified In Chapter Iii, Point 9 Of The Swz
|