Part No. 1 Of The Order: Renovation Of The Surface Of The Section: Ul. Biecka Together With Improvement Of The Technical Condition Of The Road Bridge Over The Stróżowianka Stream, Ul. Jagiełły, Ul. Wróblewskiego In The Design And Build System, Renovation Of The Street Surface. Cmentarna And Installation Of A Vehicle Charging Station.1) The Subject Of The Order Is The Performance Of The Following Construction Works: A) Renovation Of The Surface Of A Section Of Ul. Biecka Along With Improving The Technical Condition Of The Road Bridge And Footbridge Over The Stróżowianka Stream Along Ul. Biecka In Gorlice In The Design And Build System, B) Renovation Of The Surface Of The Section Of Ul. Jagiełły Together With The Distribution Of The Combined Sewage System In Gorlice - In The Design And Build System, C) Renovation Of The Surface Of The Section Of Ul. Wróblewskiego In Gorlice - In The Design And Build System, D) Renovation Of The Pavement Of Ul. Cmentarna In Gorlice - Execution Of Works Based On Design Documentation, E) Design, Purchase And Installation Of 2 Electric Car Charging Stations Along Ul. Wróblewskiego And Ul. Karwacjanów In Gorlice.2) The Scope Of The Subject Of The Order Includes: A) Preparation Of Design Documentation Necessary To Obtain A Building Permit Or A Certificate Of No Objection To The Performance Of Works That Do Not Require A Building Permit, B) Obtaining The Opinions, Consents, Arrangements And Permits Required By Law, Including: Incl. With The Network Administrators Of Mpgk, Tauron Dystrybucja S.A., Polska Spółka Gazownictwa, Orange, The Provincial Office For The Protection Of Monuments, Etc., C) Preparation Of A Temporary Traffic Organization Design For The Duration Of Construction, D) Preparation Of A Permanent Traffic Organization Design (If Necessary), E) After Preparation Of Documentation, The Contractor Is Obliged To Prepare And Submit An Appropriate Application: I.E. Reporting Works That Do Not Require A Building Permit / Building Permit In Accordance With The Act Of July 7, 1994 Construction Law And Obtaining Appropriate Administrative Decisions / Certificates Allowing The Execution Of Construction Works, F) Execution Of Preparatory Works, G) Execution Phase - Execution Of Construction Works Based On Completed And Approved Designs And Documentation Attached To The Swz, H) Preparation Of As-Built Documentation Together With As-Built Cost Estimates, As-Built Geodetic Inventory Map (The Map Should Be Provided With An Official Clause By The Service Authority Geodetic And Cartographic Or Contain A Declaration Of Obtaining A Positive Verification Result) And Other Documents Resulting From Applicable Standards And Regulations.3) A Detailed Description Of The Subject Of The Order Is Set Out In The Documentation Below: A) Functional And Utility Program: Renovation Of Ul. Biecka Together With The Bridge Over The Stróżowianka Stream And Ul. Jagiełły Along With The Distribution Of Combined Sewerage Along Ul. In Gorlice - Annex No. 1 To Swz, B) Decision 155/2022 Regarding Recommendations To Remove Technical Defects On The Bridge Along Ul. Biecka - Annex No. 2 To Swz, C) Design Of Permanent Traffic Organization For The Section Of Ul. Biecka - Annex No. 3 To Swz, D) Permanent Traffic Organization Design For Ul. Jagiełły - Annex No. 4 To The Swz, E) Functional And Utility Program: Renovation And Reconstruction Of Streets And Roadways In The Area Of The Old Town In Gorlice - Annex No. 5 To The Swz - Note: Only The Scope Of This Fup Should Cover The Renovation Of The Road Section . Wróblewskiego,F) Functional And Utility Program: Electric Car Charging Station Along Ul. Wróblewskiego In Gorlice - Annex No. 6 To Swz, G) Connection Conditions For Vehicle Charging Stations Along Ul. Wróblewskiego - Annex No. 7 To Swz, H) Executive Design Reconstruction Of Cmentarna Street In Gorlice, Including Reconstruction Of The Sidewalk And Construction Of Parking Spaces - Annex No. 8 To Swz, I) Temporary Traffic Organization Design For Ul. Cmentarna - Annex No. 9 To Swz, J) Project Of Permanent Change Of Traffic Organization For Ul. Cmentarna - Annex No. 10 To Swz, K) Functional And Utility Program: Electric Car Charging Station Along Ul. Karwacjanów In Gorlice - Annex No. 11 To Swz, L) Connection Conditions For Vehicle Charging Stations Along Ul. Karwacjanów – Annex No. 12 To Swz.
|