1. The Subject Of The Order Are Construction Works Related To The Execution Of The Task: Modernization Of The Hołdunów Sewage Treatment Plant In Lędziny. Ultimately, The Treatment Plant Is Designed For The Following Amounts Of Sewage: Q Average = 800M3/D, Q Maxd = 1,100M3/D, Plm = 8,500.2. The Subject Of The Order Is Described In Detail In The Design Documentation, Which Constitutes Annex No. 1 To The Swz, Containing: • Construction Design, Volume I - Land Development Design • Construction Design, Volume Ii - Architectural And Construction Design • Technical/Executive Design, Volume Iii • Volume Iv - Opinions, Arrangements, Attachments• Technical Specifications For The Execution And Acceptance Of Construction Works• Bill Of Quantities, Which Is An Annex To The Swz. The Bill Of Quantities Attached To The Swz Is For Information Purposes Only. After Reviewing The Design Documentation And Other Documents, The Contractor Is Obliged To Determine The Scope Of Work Necessary To Achieve The Result.3. The Scope Of The Subject Of The Order Includes In Particular: Designed Facilities: Ob 1. Automatic Sampling Station Ob 2. Sand Screener Ob 4. Separation Chamber Ob 5. Bioreactor 2 Lines Ob 6. Secondary Settling Tanks Ob 7. Sludge Pumping Station Ob 8. Oxygen Stabilization Chamber Ob 10. Container Station Blowerob 11. Pixob Coagulant Station 12. Measuring Wellob W1. Ob Shelter G1. G2. Garages Reconstructions, Renovations: Ob 3. Local Pumping Station Ob 9. Technical Building Ob 13. Existing Treated Sewage Chamber Facilities Subject To Demolishment: • Screened Sand Trap Shelter • Primary Settling Tank • Anoxic Chamber (Denitrification) • Aeration Chambers (Nitrification) • Secondary Settling Tanks • Chamber Sludge Stabilization, • Sludge Storage Rooms/Garages/Technical Rooms - 3 Facilities. Facilities And Accompanying Works • Construction And Reconstruction, Replacement Of Technological Pipelines: Sewage, Sludge, Air, Pix, Process Water, • Construction And Reconstruction Of Internal Installations: Sanitary Sewage, Water, Energy, Control, Central Heating And Ventilation. • Construction Of Internal Roads, Parking And Maneuvering Areas Within The Sewage Treatment Plant. Note: The Expansion And Modernization Of The Sewage Treatment Plant Will Be Carried Out During Its Operation. Throughout The Entire Period Of Works And Start-Up Of The New Technological System, The Treatment Plant Must Ensure The Appropriate Treatment Effect Resulting From The Current Water Permit. During The Works, It Will Be Possible To Decommission Individual Modernized Facilities, But As A Whole The Existing Treatment Plant Must Be Operational And The Principle Should Be To Minimize Disturbances In The Operation Of The Existing Treatment Plant. The Investment Is Covered By A Building Permit - Decision No. 16/Lę/2024 Of 31 January 2024 Starosta Of Bieruńsko-Lędziński.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79223985
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.