Works For Complete Or Part Construction And Civil Engineering Work - Connection Of The Pore Water Wells Cabr 13 To 16 Of The Iaa Culmitzsch, Construction Phase 2: Pore Water Wells Cabr14 To Cabr15; Earth, Pipeline, Water And Traffic Infrastructure Construction Work, Emsr Services. 32,670 M³ Of Excavated Earth For Buildings, Paths, Cable Routes; Deliver And Install 3,739 M³ Sand 02-04 Filling Material; Deliver, Transport And Install 35,833 M³ Of Soil; Supply And Lay 456 M Of Steel Protective Pipes Of Various Diameters; Supply And Lay 332 M Of Pe Cable Protection Pipe, Dn 50; Supply And Lay 1,885 M Of Cable Protection Pipe Of Fiber Optic Cable Dn 50; Deliver And Relocate 2 Pieces Of Pehd Pe 100 Shaft Structures Dn 2500; Deliver And Relocate 2 Pieces Of Pehd Pe 100 Shaft Structures Dn 1700; Deliver And Relocate 1 Piece Of Pehd Pe 100 Shaft Structure Dn 1500; Supply And Install 2,034 M Pehd Pe 100 Pipeline Sdr 17 Of Various Diameters; 8 Pieces Of Fittings, Halar Coated, Deliver And Install; 92 Pieces Of Pehd Pe 100 Molded Parts; 2 Wells 80 M Deep With Well House With Technical. Completely Manufacture Equipment; Manufacture 9 Pieces Of Well Head, Frame, Covers Made Of Stainless Steel As Special Components; Supply And Install 3 Pieces Of Submersible Motor Pump For Wells; 152 M Pe 100 Pressure Pipes, Sdr 11, Deliver And Lay 40; 152 M Pe 100 Pressure Pipes, Sdr 11, As 50 Deliver And Lay; 152 M Pe 100 Pressure Pipes, Sdr 11, Since 63 Deliver And Lay; 869 M Pe 100 Pressure Pipes, Sdr 17, As 160 Deliver And Lay; 665 M Pe 100 Pressure Pipes, Sdr 17, As 225 Deliver And Lay; 8,010 M Of Emsr Cables; 3 Pieces Of Emsr Equipment For The Well Houses And The Radio Mast; 10,500 M² Temp. Build, Maintain And Dismantle Transport Routes From Fss 0/45; Supply And Lay 1,160 M² Of Farm Roads/Stand Areas With Eco-Paving For Farm Roads; Deliver And Install 211 Pieces Of Concrete Palisades D=200 Mm; Deliver And Move 45 M Of Granite Board; Supply And Install 66 M Granite Base; Deliver And Install 1,447 M³ Base Layer Fss 0/45, H=0.36 M (Various Heights); 21 M Metal Railing Made Of V4a Stainless Steel; 20 Pieces Pipe Support System Made Of V4a Stainless Steel; 290 M² Hydraulic Engineering Work, Hydraulic Stones In Concrete.
|