Landscaping Work – Ammersee Gymnasium Extension Ve 212108_502 Outdoor Facilities Construction Section 2.1-2.3. Ba2.1 Includes The Redesign Of The Existing Teacher Parking Lot Including Access As Well As The Renovation Of A Fire Department Access. The Access Road Is To Be Widened And A New Pedestrian Crossing Is To Be Created. An Existing Footpath And Cycle Path Is To Be Demolished And Practical Lawn Is To Be Sown Instead. In The Parking Lot, The Grass Paving Will Be Demolished In Places, Trees Will Be Planted And New Bicycle Parking Spaces Will Be Installed. The Fire Department Access Made Of Water-Bound Road Surface Will Be Demolished In The Upper 20 Cm And Rebuilt And Given A Steeper Cross-Slope. The Work In This Section Must Take Place And Be Completed During The 2024 Summer Holidays. Ba2.2 Includes The Construction Site Clearance And Construction Site Setup For A Geothermal Probe Field, Which Is To Be Created On The Schools Grass Playing Field. This Includes Removing The Turf, Temporarily Storing The Topsoil, And Setting Up Construction And Tree Protection Fences. Due To Limited Space, It Is Important To Follow The Planning Exactly When Installing The Topsoil. Ba2.3 Includes The Redesign Of The School Yard Area And The Adjacent Green Areas. The Northern Area Of The Lawn Joint Paving Will Be Partially Unsealed, Partially Stored And Reinstalled At An Adjusted Height. Trenches Up To 3 M Deep Must Be Dug For Laying A Sewer Pipe. On The Northern Edge, An In-Situ Concrete Path With A Flat Steel Handrail Is To Be Created, Which Rises Up To 30 Cm Above The Ground With A Gradient Of Up To 6%. In The Peripheral Areas, Perennials And Trees Will Be Planted, Seating Steps Will Be Installed And Wooden Decks Will Be Placed On Existing Concrete Bases. The Fire Department Access Is To Be Continued In The Form Of A New Gravel Grass Path. Lean Grassland Is To Be Established On A Large Part Of The Unsealed Area. A Large Part Of The Work Takes Place During Active School Operations. Construction Work For A New School Building Is Also Taking Place On The Site At The Same Time. Since A Separate Construction Site Access Is Used, The Points Of Contact Are Likely To Be Limited To The School Yard Area (2.3) And The Grass Playing Field (2.2). However, Space Is Very Limited Due To The Building Construction Work And School Operations Taking Place At The Same Time. Compliance With The Clients And Planners Specifications Is Therefore Crucial From Both A Spatial And A Temporal Perspective.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79216624
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.