Local Administration Of The Work, Standard Work Sign Box, Mobilization Of Equipment, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), With Crawler Tractor.Af_05/2018, Horizontal Excavation In Soil 1St Category With Crawler Tractor (100Hp/Blade: 2, 19M3). Af_07/2020, Loading, Maneuvering And Unloading Soil And Granular Materials In A 10 M³ Dump Truck - Loading With Hydraulic Excavator (1, 20 M³ / 155 Hp Bucket) And - And Free Unloading (Unit: M³). Af_07/2020, Transport With 10 M³ Dump Truck, On Urban Road With Primary Coating (Unit: M3xkm). Af_07/2020, Spreading Material With Crawler Tractor. Af_11/2019, Execution And Compaction Of Landfill With Predominantly Clay Soil - Excluding Soil, Excavation, Loading And Transport. Af_11/2019, Regularization And Compaction Of Predominantly Clayey Soil Subgrade. Af_11/2019, Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width. From 0.8 M To 1.5 M, On - 1St Category Ground, In Locations With High Level Of Interference. Af_02/2021, 20 M³ / 155 Hp) E - Free Discharge (Unit: M3). Af_07/2020, On Urban Road Under Primary Coating (Unit: M³xkm). Af_07/2020, Ballast With Granular Material (Crushed Stone N.2), Applied On Floors Or Slabs On Ground, Thickness Of *10 Cm*. Af_08/2017, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Additional For Dmt Exceeding 30 Km (Unit: Txkm). Af_07/2020, Concrete Pipe For Rainwater Collection Networks, 800 Mm Diameter, Rigid Joint, Installed In A Location With A High Level Of Interference - Supply And - Laying. Af_12/2015, 400 Mm Diameter, Installed In A Location With Low Levels Of Interference - Supply And Installation. Af_12/2015, Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Adjustment Of The Natural Soil). Af_08/2020, Mechanized Trench Backfilling With Backhoe Loader (Retro Bucket Capacity: 0.26 M³ / Power: 88 Hp), Width Up To 0.8 M, Depth Up To 1, - With Soil (Without Replacement) Of 1St Category, With Vibrating Plate. Af_08/2023, Boca Bstc D = 0.80 M - Consity 20° - Commercial Sand And Crushed - Straight Wings, 40 M - Consensitivity 20° - Commercial Sand And Crushed - Straight Wings, Execution And Compaction Of Base And Or Sub Base For Dry Macadam Paving - Exclusive Cargo And Transport. Af_11/2019, 20 M³ / 155 Hp) E - E Free Discharge (Unit: M3). Af_07/2020, Additional For Dmt Exceeding 30 Km (Unit: M3xkm). Af_07/2020, Execution And Compaction Of Base And Or Sub-Base For Simple Graded Crushed Paving - Exclusive Cargo And Transport. Af_11/2019, Execution Of Priming With Diluted Asphalt Cm-30, Bonding Painting With Rr-2C Emulsion, Execution Of Pavement With Application Of Asphalt Concrete, Bearing Layer - Exclusive Loading And Transport, Loading Of Asphalt Mixture In 10 M³ Dump Truck (Unit: M3). Af_07/2020, Dmt Up To 30 Km (Unit: Txkm). Af_07/2020, Transport With 30,000 L Asphalt Material Transport Tank Truck, Dmt Up To 30Km (Unit: Txkm). Af_07/2020, Additional For Dmt Exceeding 30 Km (Unit: Txkm). - Af_07/2020, Painting Of Road Axis On Asphalt With Retroreflective Paint Based On Acrylic Resin With Glass Microspheres, Mechanical Application With Marker - Self-Propelled. Af_05/2021, Bidirectional Reflective Tack - Supply And Installation, Steel Plate Sign
|