Raising Of Pv Cap By Up To 20 Cm, Mechanized Piping At The Bottom Of The Trench With Vibrating Plate, Excavation Exclusive, Surveyors Assistant With Additional Charges, Base, With Mixing In The Track, With Running Spout Improved With 2% Cement, Compacted In Energy Of The Modified Proctor (Execution, Including Supply And Transport Of Cement, Supply Of The Running Spout, Spreading, Humidification, Homogenization And Compaction Of The Mixture; Excludes Transport Of The Running Spout), Double Inlet (Type B - Concrete), Frame, Grid And Corner, Including Excavation, Backfilling And Boot-Out, 04/11/2024, Simple Tubular Concrete Culvert, Bstc Ø 0.80M - Mouth (Execution, Including Supply And Transport Of All Materials, Exclusive Excavation And Compaction), Class Ca-1. Bstc Ø 0.80M - Body (Execution, Including Supply And Transport Of All Materials And Cradle, Collection Box And Type B Drainage (120 For Drainage, Pre-Molded, Half-Cane Type, Diameter 40Cm, Exclusive Cover, Including Laying In Mortar, Mixture 1:3 (Cement And Sand), Excavation, Transport And Removal Of Excavated Material (In Bucket), Mechanical Loading Of Material Any Nature On Truck, Exclusive Transport, Barbed Wire Fence, Type Oc.Ca-01 (With 4 Wires And Wooden Post With Spacing Of 2.5 Meters) (Execution, Including Excavation, Supply, Laying And Transport Of All Materials) , Type A Manhole Chimney, In Masonry With Ca-50 Steel Steps, Mechanical Co-Compaction Of Backfill With Vibratory Roller At 95% Of The Normal Proctor, Including Spreading, As Built (As Built) Of Projects With An Area Up To 10,000 M2 ( Earthworks - Plan And Sections), Cyclopean Portland Cement Concrete With 30% Hand Stone, Fck= 15.0 Mpa (Execution, Including Supply And Transport Of Aggregates), Lean Concrete, Mixture 1:3:6, Prepared On Site With Concrete Mixer, Without Structural Function E=5 Cm, Manual Demolition Of Concrete, Without Frame, Including Removal And Stacking, Exclusive Transport And Removal Of Demolished Material, Mechanized Demolition Of Reinforced Concrete, With Pneumatic Equipment, Deforestation, Removal And Cleaning, Including Transport Up To Fifty (50) Meters, Engineer/Architect, Junior Level, Including Additional Charges, Moisture Content Test - In Laboratory - Soils, Mechanical Excavation Of Trenches With Depths Greater Than 3.0M And Less Than Or Equal To 5.0M, Including Load By Truck, Exclusive Transport And Unloading, Mechanical Excavation In 1St Category Material, Exclusive Transport And Unloading (Disposal/Material Contaminated With Debris And Backfill), Horizontal Mechanical Excavation, With Crawler Tractor, In 2Nd Category Material, Including Removal And Stacking With A Maximum Distance Of Up To Fifty (50) Meters, Exclusive Loading, Transport And Unloading, Continuous Trench Shoring, With Vertical Planks, Stringers And Wooden Trunks, Reuse (3X), Execution Of Pavement With Application Of Asphalt Concrete, Layer Of Bearing - Exclusive Cargo And Transport. Af_11/2019, Supply And Placement Of Work Sign In Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With Rivets4.8X40mm, On 20X20mm Metallic Structure, Special. 1.25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two (2) Coats, Curb Guide (10X15x22) Cm And Gutter (30X10) Cm With Slope
|